
AAA-055-00012
Jaylor Operator’s Manual
- 20 -
Single Auger Trailer Units
PRE-OPERATION CHECKLIST
Efficient and safe operation of the Jaylor requires that each operator reads and understands all
the operating procedures and all related safety precautions outlined in this section. A pre-
operation checklist is provided for the operator. It is important for both the personal safety and
maintaining the good mechanical condition of the machine that this checklist is followed.
Before operating the machine the following areas should be checked off:
1. Lubricate the machine as per Maintenance Schedule.
2. Use only a tractor of adequate power and capacity to operate the machine.
3. Ensure that the machine is properly attached to the tractor. Be sure that the retainer is
installed in the drawbar pin and the safety chain is attached.
4. Check the hydraulic system. Be sure that the hydraulic reservoir in the tractor is filled to the
required specifications.
5. Check the oil level and condition in the planetary gearbox. Be sure they are within the proper
levels. Be sure there are no leaks on the gearbox. Stop leaks before continuing.
6. Inspect all hydraulic lines, hoses, fittings, and couplers for tightness. Use a clean cloth to
wipe any accumulated dirt from the couplers before connecting to the hydraulic system of the
tractor.
7. Check the tires to be sure that they are inflated to the specified pressure. Torque wheel nuts
to 180 ft-lbs (244 N-m).
8. Check that the auger rotates freely. Remove all string, twine, or other entangled material.
9. Check that the PTO driveline is locked to the tractor shaft and the guard is chained to the
frame.
10. Close and secure all guards and safety devices.
BREAKING-IN
Although there are no operational restrictions on the machine when used for the first time, it is
recommended that the following items be checked:
A. Before Starting:
•
Check oil level and condition of the planetary gearbox.
•
Cycle the unloading door and conveyor several times to fully charge the hydraulic system
with oil.
•
Disconnect PTO driveline and turn auger by hand. Be sure that it turns freely.
•
Check for debris and/or any other items that could block or affect machine operation.
•
Top up tractor oil reservoir if required.
B. After operating for ½ hour:
•
Check that all bolts and fasteners are all tightened properly. (See Torque Spec.)
•
Check that all wheel nuts are tight and torque to 180 ft-lbs (244 N-m).
•
Check the auger. Remove all string, twine, or other entangled material.
•
Check that no hoses are pinched, rubbing, or being crimped. Re-align as required.
•
Check for oil leaks. Stop leaks before continuing.
•
Lubricate all grease fittings.
C. After operating for 5 hours and 10 hours: