background image

Jason International, Inc.  •  

 

501.771.4477  

 

 

 

Page 4 of 9

  

 

 

             

Customer Service :  800.255.5766 

Copyright © 2011 Jason International.

Mortar is required when the subfloor is not smooth and 

8. 

level; when additional sound insulation is desired; or when 
the  bath  is  installed  in  a  drop-in  application.  In  alcove 
installations, a bed of mortar may also be recommended 
to aid in leveling the bath. 

NOTe: Do not use a sand bed 

to install or level the bath.

Secure the bottom of all equipment mounts so that it 

9. 

is level with the bottom of the bath. 

Position the bath 

in the area of intended installation and cut the equipment 
support strap(s) to allow the equipment to rest firmly on the 
floor. We recommend securing the equipment mounts to 
the floor with removable fasteners for ease of servicing.

protect the acrylic bath surface from damage during 

10. 

installation with a suitable material, i.e., cardboard 
and/or plastic film.  

The acrylic surface of this bath has 

been provided with a protective film which helps protect the 
bath during shipment and installation.  Additional protection 
may also be required to protect the acrylic surface during 
installation.  If the bath is tiled in, remove the necessary 
portion of the film when installing the tile.

r e M O T e   M O u n T I n g   O F   a I r   B l O w e r

 

The Jason AirMasseur system has been factory installed fol-
lowing E.T.L. Guidelines. During installation, if remote mounting 
of the blower is desired or required, the following procedures 
should be followed.

NOTe:

 

Do not remote mount the blower more than 15 

feet (457cm) away from the air inlet of the bath. Choose 

a  location  as  close  as  possible  to  the  bath  to  assure 

maximum efficiency.

The installer must determine the layout of the piping; exact 

1. 

remote mount location; and service access before begin-
ning any work. Use 1.5” (38mm) ABS or PVC plastic tub-
ing. Locate the blower in an area accessible for servicing. 

NOTe: A 15 foot extension replacement cable set can 

be purchased from your Jason supplier, if needed. To 

insure proper functioning of the system, avoid remote 

mounting in a location which requires more than six 

(6) piping direction changes. A 90° direction change 

should be made up of two 45° elbows for maximum 

efficiency.

If the blower has been factory installed, disconnect the 

2. 

blower from the air bath plumbing by removing the two 
(2) screws on the check valve outlet and disconnect the 
short piece of flex pipe between the check valve and the 
elbow by removing the two (2) screws in the elbow. (Omit 
this step on baths where the blower is not factory installed 
and remote mounting is required.)

Install the blower in the remote location. The remote mount 

3. 

locations’ ambient air temperature should remain at ap-
proximately 22°C (72°F) for optimum air heating.

Make sure the blower is well ventilated. The blower mount 

4. 

should be attached firmly to the floor. Piping between the 
remote blower location and the bath can be insulated us-
ing a minimum of 1/2” (13mm) thick insulation. Attach new 
piping to the elbow of the existing piping.

eleCTrICal

electrical  power  Supply:   

These  instructions  are  written 

assuming  60Hz,  120v  power  supply.    Special  notations  are 
also included for the Export versions of the control equipment, 
and power supply.

WA R N I N G

:  

v e R I F I CAT I O N   O F   e l e C T R I CA l 

R e q U I R e M e N T S   M U S T   b e   M A D e   b e F O R e 

INSTAllATION.  ReFeR  TO  The  eqUIpMeNT  lAbelS 

FOR  vOlTAGe  AND  FReqUeNCy  ReqUIReMeNTS.

 

NOTe:  The  bath  is  designed  for  indoor  use  only.  The 

electrical  equipment  must  not  be  exposed  to  direct 

or  indirect  water  or  moisture  contact.  The  electrical 

equipment must also be protected from dust and other 

airborne debris before, during, and after installation.

electrical Service: 

1. 

A licensed electrician must provide 

the  “dedicated”  electrical  service  protected  by  a  GFCI. 
The  location  of  the  GFCI  must  be  at  least  five  (5)  feet 
(152  cm)  away  from  the  inside  surface  of  the  bath, 
accessible for regular testing. Use copper conductors only.

 

DANGeR  —  RISK  OF  eleCTRIC  ShOCK:  Connect 

only to a circuit protected by a Ground Fault Circuit 

Interrupter  (GFCI).  In  the  unlikely  occurrence  of 

a  current  imbalance  in  the  power  conductors, 

the  GFCI  will  interrupt  the  power  to  the  bath. 

WARNING:  The  eleCTRICAl  SeRvICe  TO  The 

GFCI  MUST  NOT  be  INTeRRUpTeD  by  ANy 

CONTROl  DevICe.  lIKeWISe,  The  eleCTRICAl 

SeRvICe FROM The GFCI TO The bATh CONTROl 

ShOUlD be DIReCT AND NOT INTeRRUpTeD by A 

SWITCh. NeveR USe A SWITCh IN CONJUNCTION 

WITh  A  CONTROl  DevICe.  ThIS  WIll  vOID  The 

MANUFACTUReR’S WARRANTy.
G R O U N D I N G  

I S  

R e q U I R e D 

2. 

The  unit  should  be  installed  by  a  qualified  service 

representative and properly grounded.

3. 

Standard Equipment.

  The Integrity

TM

 AirMasseur

®

 system 

comes equipped with a heated air blower, an air switch 
control box, air switch tubing, and a color coordinated air 
actuator.  The air switch control must be plugged into a 
dedicated 120v(volt), 15A (amp), 60Hz (hertz) circuit with 
a service ground.  The air switch tubing must be firmly 
attached to the air switch control box and to the air switch 

InsTallaTIOn InsTruCTIOns (cont.)

Summary of Contents for Integrity A6060

Page 1: ...factory are the buyer s responsibility Damage sustained in transit is the responsibility of the carrier If damage is discovered If the carton shows sign of damage inspect the product before accepting...

Page 2: ...x 91 x 52 148 91 x 43 cm 217 72 x 36 x 20 5 45 36 x 17 in 44 8 183 x 91 x 52 170 91 x 43 cm 219 72 x 36 x 20 5 45 46 1 183 x 91 x 52 170 225 60 x 42 x 20 5 44 36 x 17 in 45 4 152 x 107 x 52 167 91 x...

Page 3: ...ant backer board and the deck of the bath NOTE If you use a tile flange kit modify the framing to support the bath lip as shown in Figure 1 A minimum ventilation opening of 2 x 4 5 x 10 cm for 3 the b...

Page 4: ...lve and the elbow by removing the two 2 screws in the elbow Omit this step on baths where the blower is not factory installed and remote mounting is required Installtheblowerintheremotelocation Therem...

Page 5: ...althofMassachusetts installation is to be done by a Massachusetts licensed plumber CLEANING Remove all loose debris 3 Construction plaster or excess grout can be removed with the use of a wood edge tr...

Page 6: ...e whether used as an AirMasseur or a soaking bath Blower TheJasonIntegrityTM AirMasseur systemcontainsavariable speed controlled heated air blower The blower provided is factory tested when assembled...

Page 7: ...ial number proof of purchase andmodelnumber Thiswillinsureaquickresponse on warranty items The serial number can be found on the front page of this manual or on the small card adhered to the back of t...

Page 8: ...uch other manufacturer or supplier To obtain warranty service you must contact the retailer from which the merchandise was purchased or Company s distributor in your area Written notice of warranty de...

Page 9: ...asoconstrictors vasodilators hypnotics narcotics or tranquilizers F Persons with a medical history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a...

Reviews: