NTE-182 AIS Transponder
Rubbers (Attachment)
(Dock supply)
Ground sheet
(Attachment)
1500
mm or le
ss
Pole or Mast
(Dock supply)
NQD-4382
Junction Box
Fixing belts
(Attachment)
Example of reinforcement
Protection sheet
(Attachment)
(Dock supply)
Gland 25a (JIS F 8802)
(Dock supply)
*3
*3
*3
7x2x0.75mm
2
(JIS:TTYCYS-7)
(Dock supply)
*4
Cautions
1. *1: Seal this section with self-bonding
tape and then wrap with vinyl tape.
2. *2: When the cable length is 500 mm
or longer, fix it with tie-wraps along
the pole.
Do not apply tension to the cable
during installation of the equipment.
3. *3: Seal this section with a sealing
material made from silicon before
fixing the transponder.
4.
The pole or mast must be
shock/vibration free.
5. The equipment must be installed
forward of the funnel to avoid smoke
and soot.
6. The equipment must be installed
where environmental temperature is
not higher than 55 deg. C.
7.
*
4:
Seal the joint of N-type connector
with a sealing material made from
silicon in accordance with NTE-182
waterproofing procedures.
(If the joint ob N-type connector
has been sealed, it is not
necessary to seal.)
Installation Drawing of
NTE-182 AIS Transponder
With NQD-4382 Junction Box
Caution
When there is a gap between the
pole (or the must) and NQD-4382,
insert the attached rubber board.
Ground bolt
3
Summary of Contents for JHS-182
Page 1: ...Automatic Identification System JHS 182 Service Manual...
Page 2: ......