Section 3. Installing the Deck
Canister
NOTE
Prior to installing the Jandy laminar jet deck
canister, locate the jet opening (slot) in the
deck canister cover. Make sure that this
opening is pointing towards the desired target
location in the pool. Use the water stand pipe
as a reference (see Figure 3). Determining
the orientation of the deck canister will also
establish where to place the plumbing and fi ber
optic conduit.
NOTE
The deck canister lid can only rotate
approximately 90 degrees to the left or the right.
Therefore, make sure that the deck canister is
positioned towards the desired target location
prior
to completing the installation.
3.1 In-Deck
Installation
1.
Dig the hole for the deck canister approximately
24 inches deep and 18 inches in diameter. This will
ensure enough room for positioning the canister
and laying out the plumbing. This depth also
allows for the addition of a layer of pea gravel (1/8
to 1/4 size) for stability and additional drainage.
Refer to Figure 4 for deck canister dimensions.
2.
Set the deck canister in the hole. The top edge
of the lid/collar should be flush with the finished
deck, after the deck material is poured.
NOTE
To ensure that the canister stays upright while
installing
and
leveling the unit, place a 6 inch
piece of 1 inch PVC pipe in the construction
support stake-up socket located on the bottom
of the canister (see Figure 5).
Figure 3. Laminar Jet Deck Canister Schematic
Figure 4. Deck Canister Dimensions
2.50 in.
18.18 in.
21.78 in.
12 in.
13.75 in.
3.
Level the deck canister. To hold the canister in
place while the deck is poured, secure the canister
by tying it with tie wire to the steel framework of
the deck. To mount level, horizontal rebar hooks
and vertical rebar sockets are provided around the
outside of the canister. See Figure 5.
4.
Plumb the incoming filtered water supply to the
1 inch hub located on the side of the deck canister
marked “Inlet” (see Figure 6). The filtered water
supply must include a check valve (see Figures 1
and 2).
5.
Plumb the conduit for the fiber LED cable to the
3/4 inch socket located either side of the deck
Horizontal Rebar
Horizontal Rebar
Hooks (4 Places)
Vertical Rebar
Vertical Rebar
Sockets (4 Places)
Stake-Up Socket
1” PVC
Stand Pipe
Figure 5. Deck Canister Rebar Hooks and Sockets
Deck Canister
Water Output
Deck Canister
Lid with Slot
Deck Material
Deck Material
Laminar Jet
Assembly
Deck Canister Lid
Adjustable Collar
1" Laminar Jet
Water Supply
1½" Drain
Line
¾" Electrical
Conduit
Water Inlet to Jet
Assembly
1" PVC Stand
Pipe