SM-17
Jade Range LLC
– A Middleby Company
Titan
TM
Series Heavy Duty Range
Model Series JTRH, JMRH & JTRHE
REVIEW COPY
7
WARNING
PERFORM THE ELECTRICAL LOCKOUT/
TAGOUT PROCEDURE.
1. Shut off all electrical controls and perform the
Electrical LOCKOUT/TAGOUT procedure.
WARNING
PERFORM THE GAS LOCKOUT/TAGOUT
PROCEDURE.
2. Shut off all gas controls and perform the Gas
LOCKOUT/TAGOUT procedure.
3. Remove kick plate as described under
COVERS AND PANELS.
4. Remove thermocouple from oven pilot control
valve.
5. Disconnect burner and pilot gas lines from
safety control valve.
6. Remove screws supporting safety control
valve and remove valve assembly.
7. Reverse the procedure to install control valve.
Ignition Module
Figure 17: Ignition Module (Old style)
A. Ignition Module
B. Door Switch
C. Door Switch Bracket
Figure 18: Ignition Module (New style)
A. Ignition Module
B. Door Switch
C. Door Switch Bracket
WARNING
PERFORM THE ELECTRICAL LOCKOUT/
TAGOUT PROCEDURE.
1. Shut off all electrical controls and perform the
Electrical LOCKOUT/TAGOUT procedure.
WARNING
PERFORM THE GAS LOCKOUT/TAGOUT
PROCEDURE.
2. Shut off all gas controls and perform the Gas
LOCKOUT/TAGOUT procedure.
3. Remove oven control panel as described under
COVERS AND PANELS.
4. Remove the door switch as described under
DOOR SWITCH.
5. Remove door switch bracket assembly.
6. Remove two nuts retaining ignition module.
7. Mark and disconnect wires on ignition module.
8. Reverse the procedure to install ignition module.