11
2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION
STEP 13A
Insert fixed glass support rail into panel post and tighten
set screw.
GLASS PANEL
SUPPORT RAIL
DRILL 1/8" PILOT HOLE AND
SCREW M3.5X9.5 mm SCREW
INTO HOLE
STEP 13B
Drill a 1/8" pilot hole into tower support rail using the hole
in the glass panel support rail. Screw M3.5X9.5 mm
screw into hole.
STEP 14
Install cover cap on fixed glass wall post.
STEP 15
Install glazing gasket on curved glass wall post on the
outside. Note orientation of gasket. Soapy water may
help to insert the glazing gasket. On the inside of
enclosure, apply sealant the entire length of glass and
wall post as well as the entire length of glass and tower.
COVER CAP
WALL POST
GLASS
GLAZING GASKET
INSIDE OF
ENCLOSURE
APPLY SEALANT
GLAZING
GASKET
INSIDE OF
ENCLOSURE
APPLY
SEALANT
TOWER TOP PLATE