• Connect hot and cold water supply hoses.
• Plug in electric line cord.
• Move J-90 into final position.
• Install drain, connect to stub-out using band seal coupling provided.
• Adjust the leveling screws in the base frame feet and lock them into position.
• Secure J-90 in position using clamps provided.
• Snap base cover trim into place
Completing the Installation for J-Dream 90
LAG
SCREW
FLOOR
CLAMPS
ADJUSTABLE
FOOT
2 3/4"
3 5/32"
7