Jacuzzi J-DREAM 90 Owner'S Manual Download Page 5

Read all instructions before beginning installation.

Room Construction: Important

The room where the shower unit is to be located must be constructed of materials that can withstand excessive amounts
of moisture and condensation.  Large amounts of steam can be released into the room when the shower door is opened.
Providing natural or forced ventilation of the room will help maintain comfort and minimize  moisture damage to the building.
Jacuzzi Whirlpool Bath is not responsible for damages resulting from  excess moisture or water spillage.   Consult an architect
or engineer for aid in designing your interior structure.  Do not install heat lamps directly above shower unit.  The clear
top will deform from excess heat.

Water Supply Required

The water supply must be capable of delivering 3 gallons (11 liters) per  minute minimum to the unit within a pressure range
of 20-65 PSI (1.4-4.6 BAR).  Pressures in excess of 65 PSI (4.6 BAR) must be reduced with a regulator in the supply line.
This is the amount of water and pressure required to ensure adequate performance of the J-Dream; it is not the water
consumption rate.

Electrical Power Required

See ELECTRICAL REQUIREMENTS  for power required.  Power supplied to the unit must be through a *GFCI protected,
dedicated circuit with proper bonding and grounding.  The GFCI must be located in an area that will allow access for frequent
testing.

Options Available

A pressure balancing valve is available as an  option to be added to the hot and cold  water supply.  Use of this pressure
balancing valve will  require different fittings to be provided at the water supply stub out.  Consult instructions supplied with
pressure balancing valve before connecting the hot and cold water supply.

Caulking

Select a non-yellowing clear caulk suitable for bathroom use in a steam enviroment. We suggest one of the following:
(a) Red Devil Inc.  #0870
(b) Ace Hardware Corp.  #17600

* GFCI ( Ground Fault Circuit Interrupter) is also known as an ELCB ( Earth Leakage Circuit Breaker.) This device must be
a type approved by electrical codes and standards to protect users from potential electrical hazards.

Installation & Operating Instructions

(Right Hand & Left Hand Models)

4

Summary of Contents for J-DREAM 90

Page 1: ...OWNER SMANUAL Installation Operating Instructions J DREAM 90 Shower System Right Hand Left Hand Models TM WHIRLPOOL BATH R...

Page 2: ...J DREAM 90 LEFT HAND SHOWN DIMENSIONS IN INCHES 1...

Page 3: ...t Interrupter GFCI This is also known as an Earth Leakage Circuit Breaker ELCB Check at least once a month to be sure this is operational With the unit operating push in the test button The unit shoul...

Page 4: ...ing Jacuzzi Whirlpool Bath is not responsible for damages resulting from excess moisture or water spillage Consult an architect or engineer for aid in designing your installation Maintenance Cleaning...

Page 5: ...the amount of water and pressure required to ensure adequate performance of the J Dream it is not the water consumption rate Electrical Power Required See ELECTRICAL REQUIREMENTS for power required P...

Page 6: ...VED LOCAL GROUND AN APPROVED GROUND MAY BE AN 8 FOOT LONG GROUND ROD 3 METER LONG EARTH ROD A PLATE ELECTRODE OR OTHER ACCEPTABLE BOND LOCATION CHECK YOUR LOCAL BUILDING CODE FOR REQUIREMENTS SEE PAGE...

Page 7: ...ED LOCAL GROUND AN APPROVED GROUND MAY BE AN 8 FOOT LONG GROUND ROD 3 METER LONG EARTH ROD A PLATE ELECTRODE OR OTHER ACCEPTABLE BOND LOCATION CHECK YOUR LOCAL BUILDING CODE FOR REQUIREMENTS SEE PAGE...

Page 8: ...E TO THE HOUSE ELECTRICAL PANEL OR APPROVED LOCAL GROUND AN APPROVED GROUND MAY BE AN 8 FOOT LONG GROUND ROD 3 METER LONG EARTH ROD A PLATE ELECTRODE OR OTHER ACCEPTABLE BOND LOCATION CHECK YOUR LOCAL...

Page 9: ...in connect to stub out using band seal coupling provided Adjust the leveling screws in the base frame feet and lock them into position Secure J 90 in position using clamps provided Snap base cover tri...

Page 10: ...rol the shower manually FIGURE 2 12 11 10 9 ON OFF buttons for the jet groups Turbo massage start button 6 Shower start button 5 Waterfall start button 4 Steam program start button 1 2 3 8 7 steam ope...

Page 11: ...cally be programmed to operate at an average speed of alternation between the groups of water jets and all eight groups of jets will be active The intensity of the hydromassage can be adjusted on each...

Page 12: ...between the flexible hose and the shower head If limestone deposits are on the jet nozzles the shape of the water jets may be altered Remove and clean the nozzles occasionally Forcefully turn the noz...

Page 13: ...le pole cable length 650 mm with tinned bare terminals 240 VAC Coated triple pole cable to electric pump length 2800 mm with eyelet type terminals internal diam 4 mm 240 VAC Silicon coated triple pole...

Page 14: ...applicable code standards listings generally available on a national basis for products of this type It is the responsibility of the installer owner to determine specific local code compliance prior...

Reviews: