Jacuzzi J-DREAM 90 Owner'S Manual Download Page 13

Electrical Diagram

Double -pole cable
0,75 mm

2

 H 0,5

(length = 3100 mm)
with fast terminals
(12V)

Sol. valve,
drainage

Sol. valve,
filling

Sol. valve,
filling

Sheathed cable to
solenoid valves (length
= 1000 mm) with fast
terminal (12V).

Sol. valve,
waterfall

Sol. valve,
shower

Sol. valve,
turbo 3

Sol. valve,
turbo 4

NOTE: The numbers on the
electrical diagram refer to the
labeling on the leads.

5-pole cable (level
probe, see key; length
= 2500 mm) with fast
terminals (12V).

Power supply triple-pole
cable (length = 650 mm)
with tinned bare terminals
(240 VAC).

Coated triple-pole cable
to electric pump:(length
= 2800 mm) with eyelet-
type terminals internal
diam. 4 mm (240 VAC).

Silicon coated triple-pole cable
to electric heating element
(length = 1800 mm) with
terminals. (240 VAC).

Display cable: with 90°
connector (length = 1500 mm)
(12V).

ELECTRICAL

DIAGRAM

NOTE:
-Nylon terminals are used.
- Length of cable refers
to distance from press
connectors (*) of electronic box.

Sol. valve,
turbo 2

Sol. valve,
turbo 1

Yellow - green
color

Probe

fastener

1
2
3
4
5

Connected

to BND

BND

S1
S2
S3

*VC (12V)

Wire

color

Brown

White

Green

Grey

Yellow

1

3

2

4

5

6

7

8

11

12

9

10

3

4

5

6

7

14

16

13

15

12

Summary of Contents for J-DREAM 90

Page 1: ...OWNER SMANUAL Installation Operating Instructions J DREAM 90 Shower System Right Hand Left Hand Models TM WHIRLPOOL BATH R...

Page 2: ...J DREAM 90 LEFT HAND SHOWN DIMENSIONS IN INCHES 1...

Page 3: ...t Interrupter GFCI This is also known as an Earth Leakage Circuit Breaker ELCB Check at least once a month to be sure this is operational With the unit operating push in the test button The unit shoul...

Page 4: ...ing Jacuzzi Whirlpool Bath is not responsible for damages resulting from excess moisture or water spillage Consult an architect or engineer for aid in designing your installation Maintenance Cleaning...

Page 5: ...the amount of water and pressure required to ensure adequate performance of the J Dream it is not the water consumption rate Electrical Power Required See ELECTRICAL REQUIREMENTS for power required P...

Page 6: ...VED LOCAL GROUND AN APPROVED GROUND MAY BE AN 8 FOOT LONG GROUND ROD 3 METER LONG EARTH ROD A PLATE ELECTRODE OR OTHER ACCEPTABLE BOND LOCATION CHECK YOUR LOCAL BUILDING CODE FOR REQUIREMENTS SEE PAGE...

Page 7: ...ED LOCAL GROUND AN APPROVED GROUND MAY BE AN 8 FOOT LONG GROUND ROD 3 METER LONG EARTH ROD A PLATE ELECTRODE OR OTHER ACCEPTABLE BOND LOCATION CHECK YOUR LOCAL BUILDING CODE FOR REQUIREMENTS SEE PAGE...

Page 8: ...E TO THE HOUSE ELECTRICAL PANEL OR APPROVED LOCAL GROUND AN APPROVED GROUND MAY BE AN 8 FOOT LONG GROUND ROD 3 METER LONG EARTH ROD A PLATE ELECTRODE OR OTHER ACCEPTABLE BOND LOCATION CHECK YOUR LOCAL...

Page 9: ...in connect to stub out using band seal coupling provided Adjust the leveling screws in the base frame feet and lock them into position Secure J 90 in position using clamps provided Snap base cover tri...

Page 10: ...rol the shower manually FIGURE 2 12 11 10 9 ON OFF buttons for the jet groups Turbo massage start button 6 Shower start button 5 Waterfall start button 4 Steam program start button 1 2 3 8 7 steam ope...

Page 11: ...cally be programmed to operate at an average speed of alternation between the groups of water jets and all eight groups of jets will be active The intensity of the hydromassage can be adjusted on each...

Page 12: ...between the flexible hose and the shower head If limestone deposits are on the jet nozzles the shape of the water jets may be altered Remove and clean the nozzles occasionally Forcefully turn the noz...

Page 13: ...le pole cable length 650 mm with tinned bare terminals 240 VAC Coated triple pole cable to electric pump length 2800 mm with eyelet type terminals internal diam 4 mm 240 VAC Silicon coated triple pole...

Page 14: ...applicable code standards listings generally available on a national basis for products of this type It is the responsibility of the installer owner to determine specific local code compliance prior...

Reviews: