JACLO J-TH34 Installation Instructions Manual Download Page 8

OCTOBER 3, 2017

jaclo

 

industries 

 |  129 Dermody Street   Cranford, NJ 07016

p

 908.653.4433 | 800.852.3906   

f

 908.653.1717 | 800.852.4133   

JACLO.COM

   |   PG 8

[STEP 3] 

PLUMB ROUGH USING APPROPRIATE FITTINGS

 

     Diverter and Thermostatic valve are factory sealed, do not separate!

 

 

1.  Plumb hot and cold inlets on thermostatic body.  Part #’s: J-TH34. J-TH12, J-TH34-686, J-TH34-688, 

 

   J-THVC12.  

Figure 8

 

 

2.  If using lower port on thermostatic body, a separate volume control is required.  If not, port must be plugged.  

  

Figure 8

 

3.  Select diverter ports to be used.  C, A, B and plumb with appropriate fittings.  Part #’s: J-TH34-686, 

           J-TH34-688, J-20686 and J-20688.  

(Note: Port A is not used with the 2-way diverter and must be capped)

 

 

  

Figure 8

    

 

 

Note: Two way diverter can be used as a single outlet and volume control by capping B or C port.  Three

 

way diverter can be used as two way diverter by capping any single port or a volume control by capping

 

any two ports.

C Port

B Port

A Port

Cold

Inlet

Hot

Inlet

B

A

C

Extra Outlet requires

volume control or plug (not supplied)

"JACLO INDUSTRIES PROPRIETARY INFORMATION"

Dimensions are for reference only.

Jaclo reserves the right to change specifications without notice.

®

®

Thermostatic Body

Figure 8

Summary of Contents for J-TH34

Page 1: ...NG CODES PUBLIC HEALTH AND SAFETY CODES This unit has no serviceable filter See Valve Maintenance Section RETAIN THESE DIRECTIONS FOR TRIM INSTALLATION System Requirements This thermostatic valve is d...

Page 2: ...upply and flush valve with cartridge and check stops removed Page 9 7 Turn off water supply and re install cartridge and check stops Page 10 8 Turn on water supply and test for leaks and all functions...

Page 3: ...stops and volume control removed Page 9 7 Turn off water supply and re install cartridge check stops and volume control Page 10 8 Turn on water supply and test for leaks and all functions 9 Twin Ell...

Page 4: ...Figure 5 3 Remove diverter cartridge Page 6 4 Connect inlet and outlet port piping SEE PAGE 8 FOR PORTS USED BLOCKED 5 See Rough in plumbing and valve flushing Page 9 6 Turn on water supply and flush...

Page 5: ...stops and diverter cartridge removed Page 9 7 Turn off water supply and re install thermostatic cartridge check stops and diverter cartridge Page 10 8 Turn on water supply and test for leaks and all f...

Page 6: ...e Remove thermostatic cartridge 2 Pull outward and twist slightly to aid removal Retain for reassembly 2 CHECK STOP REMOVAL J TH34 J TH12 J TH34 686 J TH34 688 J THVC12 a Remove hot and cold check sto...

Page 7: ...static Body Only 1 THVC12 BODY RGH 2 1 2 Thermostatic Cartridge 1 J TH12 CART 3 Thermostatic Cartridge Locknut 1 1050 3 RGH 4 Thermostatic Valve Limit Stop Ring 1 2050 4 0 5 Stainless Steel Limit Stop...

Page 8: ...volume control is required If not port must be plugged Figure 8 3 Select diverter ports to be used C A B and plumb with appropriate fittings Part s J TH34 686 J TH34 688 J 20686 and J 20688 Note Port...

Page 9: ...433 800 852 3906 f 908 653 1717 800 852 4133 JACLO COM PG 9 STEP 4 ROUGH IN PLUMBING AND VALVE FLUSH 1 Flush adapters are provided for placement into body for flushing THERM DIVERTER FLUSH ADAPTERS 10...

Page 10: ...able water to the o rings on the thermostatic cartridge and insert into valve body rotating back and forth slightly Orient cartridge with the notch up in the 12 o clock position for J TH34 and and J T...

Page 11: ...connections 6 Open diverter valve Test all positions See Figure 11 12 or 13 for diverter operation 7 Open volume control on bottom of thermostatic valve body if applicable Figure 14 8 Close hot and c...

Page 12: ...tting from STEP 2 1b 6 Rotate thermostatic valve full counter clockwise and check water temperature with thermometer Factory setting should be 100 maximum Figure 10 7 Limit stop setup FOLLOWING STEPS...

Page 13: ...at 12 o clock position full on C port a 9 o clock position full on B port at 3 o clock position Water volume increases as control moves toward full on positions Control moves 180 degrees through full...

Page 14: ...ves stops removal and installation section of the installations sheets Remove thermostatic cartridge and clean screens Remove trim and make sure the arrows on the check valve stops are facing toward t...

Page 15: ...rm to such warranty JACLO WILL NOT BE LIABLE FOR ANY CONSEQUENTIAL OR INCIDENTAL DAMAGES CAUSED BY A BREACH OF THIS OR ANY OTHER WARRANTY Some states do not allow the exclusion of limitation of incide...

Page 16: ...OCTOBER 3 2017 jaclo industries 129 Dermody Street Cranford NJ 07016 p 908 653 4433 800 852 3906 f 908 653 1717 800 852 4133 JACLO COM PG 16...

Reviews: