07610-003-92-84-R
11
1. Ensure power switch is in the OFF position and apply power to the
machine
.
2. Check the incoming power at terminal block and ensure it corresponds to voltage
listed on the data plate. If not, contact a qualified service agency to examine the
problem.
CAUTION!
Do not run the
machine
if voltage is too high or too low (refer to applicable
electrical codes)
.
3. Shut off the service breaker and mark it as being for the
machine
.
4. Advise all proper personnel of any problems and of the location of the service
breaker. Replace control box cover.
VOLTAGE CHECK
!
CAUTION
i
PRIMING CHEMICAL
FEEDER PUMPS
PREPARING
CHEMICAL FEEDER
PUMPS
These
machine
s are supplied with detergent, rinse-aid, and sanitizer chemical feeder
pumps.
Locate open ends of chemical tubes with the stiffeners and place each one in the
appropriate container.
• Red Tubing = Detergent • Blue Tubing = Rinse-aid
• White Tubing = Sanitizer
CAUTION!
Chlorine-based sanitizers can be detrimental to this machine if the chemical
solution is too strong. Contact chemical supplier to ensure the dispenser is set-up
correctly.
Chemical feeder pumps need priming when the machine is first installed or if the
chemical lines have been removed and air was allowed to enter.
CAUTION!
Water must be in the sump and wash tank before chemicals are dispensed.
1. Verify proper chemical tube with stiffener is in the proper container.
2. Use toggle switches on front of control box to prime each pump. There are three
priming switches:
3. To prime the pumps, hold the switch in the momentary position until the
chemical is seen entering the sump.
• Detergent:
!
CAUTION
!
CAUTION
INSTRUCTIONS
INSTALLATION
Summary of Contents for CONSERVER XL-E
Page 57: ...07610 003 92 84 R 50 XL E LTH BOOSTER TANK PARTS 16...
Page 61: ...07610 003 92 84 R 54 SCHEMATICS XL E XL HH 115 V 60 HZ 1 PHASE...
Page 62: ...07610 003 92 84 R 55 SCHEMATICS XL E XL HH 208 V 60 HZ 1 PHASE...
Page 63: ...07610 003 92 84 R 56 SCHEMATICS XL E LTH 208 230 V 60 HZ 1 3 PHASE...