![Jackson CONSERVER XL-E Installation, Operation And Service Manual Download Page 16](http://html1.mh-extra.com/html/jackson/conserver-xl-e/conserver-xl-e_installation-operation-and-service-manual_3270473016.webp)
07610-003-92-84-R
9
WATER SUPPLY
CONNECTIONS:
WATER HARDNESS
HIGHER THAN 3 GPG
WATER SUPPLY
CONNECTIONS:
WATER HARDNESS
LOWER THAN 3 GPG
PRESSURE
REGULATOR
SHOCK ABSORBER
CONNECTING THE
DRAIN LINE
If water hardness tests higher than 3 GPG, install the Scaltrol Water Treatment system
(see the Plumbing Options page) into the water line before the machine’s incoming
water connection point. A water shut-off valve should be installed to allow access for
service.
If water hardness tests lower than 3 GPG, install the water supply line directly to
the machine’s incoming water connection point. A water shut-off valve should be
installed to allow access for service.
The manufacturer recommends the installation of a pressure regulating valve (PRV)
in the incoming water line to ensure proper flowrate at all times and offers these
devices as options (see the Plumbing Options page). Take care not to confuse static
pressure with flow pressure: static pressure is line pressure in a “no flow” condition (all
valves and services are closed); flow pressure is the pressure in the fill line when the
valve is opened during the cycle.
The manufacturer also recommends the installation of a shock absorber in the
incoming water line and offers these devices as options (see the Plumbing Options
page). This prevents line hammer/hydraulic shock—induced by the solenoid valve as
it operates—from causing damage to the equipment.
These machines have gravity discharge drains. All piping to the machine must be 2"
NPT and must not be reduced. There must also be an air-gap between the machine
drain line and the floor sink or drain at least 1.5 times larger than the drain hose. If a
grease trap is required by code, it should have a flow capacity of 5 GPM.
After installing the incoming fill line and drain line, slowly turn on the water supply to
the machine. Check for any leaks and repair as required. All leaks must be
repaired before operating the machine.
Take care not to confuse
static pressure with
flow pressure!
PLUMBING CHECK
INSTRUCTIONS
INSTALLATION
Shut-off
Valve
Adapter
Adapter
Scaltrol
Machine
Water Line
Facility
Water Line
*Adapters needed will vary.
Example
Summary of Contents for CONSERVER XL-E
Page 57: ...07610 003 92 84 R 50 XL E LTH BOOSTER TANK PARTS 16...
Page 61: ...07610 003 92 84 R 54 SCHEMATICS XL E XL HH 115 V 60 HZ 1 PHASE...
Page 62: ...07610 003 92 84 R 55 SCHEMATICS XL E XL HH 208 V 60 HZ 1 PHASE...
Page 63: ...07610 003 92 84 R 56 SCHEMATICS XL E LTH 208 230 V 60 HZ 1 3 PHASE...