PERISTALTIC PUMP SANITIZING
DISPENSING SYSTEM
(FOR WALL MOUNT DISPENSING SYSTEMS)
The three peristaltic pumps are mounted in the dispenser box which is attached to the wall or
unit. The pump receive their electrical signals from two sources.
The first source is the rinse/fill switch which is used to prime the pump when it is first put into
operation and then every time the unit Is filled with fresh water to start a new meal period.
The second source is the timer which activates the pump during the fill cycle of the unit and
allows it to drop 15 milliliters of sanitizing solution into the rinse water.
Checkout of Sanitizing Agent Injector
The pump can be deemed operational if the following items are observed:
1. If the cam roller assembly rotates during each cycle.
2. If the solution is observed passing through the tube.
Note: Both of these operations must be observed to determine if the sanitizing agent is
being dispensed.
It it is determined that the unit is not operating correctly, the following procedures will aid in
correcting the problem:
1. Make certain that the tube is in the bottle of solution.
2. Make certain that there are no cracks in the tubing and particularly in the pump hose.
3. Check all wire connections on the pump, the timer cam, and the rinse/fill switch.
4. Check to see that there is no debris in the tubes.
5. Make sure that the tubing is inserted into the pump hose so that air is not drawn into the
system.
ITEM P/N
DESCRIPTION
1.
1543
PRIMER SWITCHES
2.
465
PERISTALTIC PUMPS
3.
465D
CAM ROLLERS
4.
465F
INTAKE HOSE
5.
4652
OUTLET TUBE
20