VISUM
|
11
TIP:
4.
Line up all your sensors on the workbench
and write the row number on each first.
Then add all the couplers and hose clamps.
5.
Then you can either power up the monitor at
the workbench with a 12V battery to
complete the “Addressing” procedure, or
carry the sensors to your tractor cab where
you have installed the Monitor to complete
the
“Addressing” procedure.
6.
After that install the sensors on the
toolbar/row unit at the air diffuser/air release.
We recommend you install with the row
numbers running from the left to the right
(standing behind the toolbar facing the tractor
cab) beginning with 1 to 99, or many rows you
have to monitor.
7.
Do not mount the monitor in the cab using a
large high-powered magnet mounting kit or
place a magnet near the monitor as it can
cause the monitor to fail.
This is the area where you
“ADDRESS” the sensor with the
magnet that is included with the sensor.
Summary of Contents for VISUM Monitor
Page 1: ...OPERATOR S MANUAL...
Page 42: ...www jassy ag January 2022...