Figure 1:
Typical Deployment (Not to scale) Air unit should be located away from water.
Model May Vary.
Machine Deployment
1.
Lay out hose from air unit location to edge of water. Air unit should be located a safe distance away from
waters edge.
2.
Attach end of air hose to AP machine.
3.
Attach anchor chain to unit at the desired distance from the surface with quick link. If anchor chain is longer
than needed, you do not need to cut it to length.
4.
Attach air hose to air unit.
5.
Deploy machine in desired spot by first lowering in machine and then lower the machine slowly using the
anchor chain to the desired depth.
6.
Plug in air unit and ensure that air is coming out of the machine. You should see flow coming out of the
machine after 15 seconds.
Adjusting Intake Depth
To adjust the intake depth you must adjust the anchor chain. The anchor chain is connected to the top of
the unit and the float(s). To raise the intake depth, shorten the anchor chain and to lower the intake depth,
lengthen the anchor chain. To set intake depth, the anchor chain should be 30” less than desired intake
measurement.