![IXIA UHD100T32 Getting Started Manual Download Page 24](http://html1.mh-extra.com/html/ixia/uhd100t32/uhd100t32_getting-started-manual_2098760024.webp)
C
HAPTER
4
How do I...
This section describes the tasks needed to set up the UHD100T32 fixed chassis for operation and to
configure it for operation in your network.
Section contents:
Unpack UHD100T32
You need to unpack the unit before physically setting it up for operation. To unpack, do the following:
1. Unpack the unit from the shipping container, and verify that you have all the required components.
The shipping carton contains the following items:
l
One UHD100T32 fixed chassis
l
One rack mounting kit (two front-post brackets, two rear-post brackets, 20 screws, two ear-
locking screws)
l
Two 90-240VAC power cords
l
One RJ45 to DB9-F cable
l
One USB to DB9-M adapter
l
Keysight standard warranty notice
l
One UHD100T32 Getting Started Guide
l
Any additional items that you ordered (such as transceivers and cables)
– 9 –
913-2626-01
Summary of Contents for UHD100T32
Page 1: ...UHD100T32 Release 1 3 Getting Started Guide 913 2626 01 Document version 202104170944 05 30...
Page 3: ...This page intentionally left blank 913 2626 01 iii...
Page 9: ...This page intentionally left blank 913 2626 01 ix...
Page 11: ...This page intentionally left blank 913 2626 01 xi...
Page 23: ...This page intentionally left blank 913 2626 01 8...
Page 87: ...This page intentionally left blank 913 2626 01 72...