3
Table of Contents
Innehåll
FOR THE INSTALLER ..................................................................................................... 5
Important information for the installer ............................................................................ 6
Checklist ....................................................................................................................... 6
What the shipment includes ........................................................................................... 7
General ......................................................................................................................... 8
Transporting and storage .........................................................................................................................................8
Positioning the heat pump ........................................................................................................................................8
Minimum and maximum working temperatures ......................................................................................................9
The heating installation’s different methods of control ..............................................................................................9
Defrosting method ....................................................................................................................................................9
Location of the temperature sensors ........................................................................................................................10
CANbus ..................................................................................................................................................................11
Detailed pictures connection area ...........................................................................................................................12
Dimensions, clearance and plumbing connections ..........................................................14
Optima 600-1100 ...................................................................................................................................................14
Optima 1400-1700 .................................................................................................................................................15
Control cabinet, Accessory unit electric/oil-fi red boiler ............................................................................................16
Double-shelled hot water heater ..............................................................................................................................16
Fit the particle fi lter ...............................................................................................................................................16
Connecting to the heating system ..................................................................................17
Flushing the heating system ....................................................................................................................................17
Connecting the heat pump to the heating system .....................................................................................................17
Connecting three-way valve ....................................................................................................................................17
Heat carrier pump G2 ............................................................................................................................................17
Connection principles .............................................................................................................................................18
Filling the heating system .......................................................................................................................................19
Connecting to the power supply ....................................................................................20
Accessories .............................................................................................................................................................20
Safety switch and earth-fault breaker ......................................................................................................................21
Emergency operation ..............................................................................................................................................21
Wiring diagram Optima 600-1100 .......................................................................................................................22
Wiring diagram Optima 1400-1700 .....................................................................................................................23
Wiring diagram Control cabinet ............................................................................................................................24
Wiring diagram Accessory unit .............................................................................................................................25
External connections diagram ................................................................................................................................26
External connections Heat pump ............................................................................................................................27
External connections Control cabinet ....................................................................................................................28
External connections Accessory unit ......................................................................................................................29
Installer and ser vice menu (I/S) ...................................................................................30
Menu over view ............................................................................................................31
Commissioning ............................................................................................................34
Start the heat pump ...............................................................................................................................................34
Start up .................................................................................................................................................................34
Other settings .........................................................................................................................................................37
Important points to check after commissioning .......................................................................................................37
Timers ........................................................................................................................38
Alarm functions ...........................................................................................................39