21
4. Installation and Initial Start-Up
4.5.3 Start screen and self-test
Immediately after switching on, the display briefly shows the start
screen. Subsequently, the furnace conducts an automatic self-test.
The performance of all furnace components is automatically
checked.
The
[Next]
button is used to reach the next entry screen.
Step 5:
Select the date format.
Confirm the entry with the green button. The
[Next]
button is used to reach the next entry screen.
Step 6:
Set the date (day, month, year).
Confirm the entry with the green button. The
[Next]
button is used to reach the next entry screen.
The initial start-up and entry of the basic settings are now complete. The furnace will now automatically conduct a self-test.
Step 7:
Confirm the privacy policy
More information about the privacy policy can be found at
http://www.ivoclarvivadent.com/digitalservices