CONTROL PANEL INSTALLATION
The control panel is placed in a box inside the furnace or next to the boiler.
Voltage 220 V - 50 Hz.
Open the instrument panel by turning of the self-threading screws.
Extend the instrument gauge capillaries avoiding all damages and pass them
through the hole at the bottom of the panel.
Later, take the cover of the boiler casing, pass the gauge capillaries through the
hole and fix the instrument panel to the cover.
Lean the cover on the boiler and insert the gauges in the boiler bulbs avoiding
any accidental breakage.
For mod. SUPERAC 1220÷4070, fix the control panel in the most convenient
position (upon or on the sides of the boiler) using the bracket in outfit.
CAUTION: all capillary gauges of the panel instruments must be inserted in
the boiler body bulbs next to the flow fitting to the heating plant.
For the electrical connections, proceed according to the instructions in the
attached electrical diagram.
Never fix the electrical cable to the sheet metal of the boiler body, door or
smoxe box
Finally, close the panel and re-fit the cover on the boiler casing.
TURNING OFF
In the event of temporary periods of inactivity (week-ends, short trips, etc.)
with no danger of frost, follow the procedure below:
-
turn off the main switch on the control panel (OFF);
-
turn of the plant main switch.
CAUTION: if there is danger of frost, do not carry out the above operations
but:
-
set the ambient thermostat on approx. 10°C.
In the event of a long period of inactivity, follow the procedure below:
-
turn off the main switch on the control panel (OFF)
-
turn of the plant main switch.
-
close fuel and thermal plant water cocks.
CAUTION: if there is danger of frost, have the thermal plant emptied by
professional qualified personnel
.
.
CLEANING
Before cleaning operations make sure that:
-
the main switch on the control panel has been turned off (OFF);
-
the plant main switch has been turned off.
The only part of the boiler that needs to be cleaned by the user is the outer
panelling; use a wet soapy cloth.
If the dirt is particularly difficult to remove, soak with water and denaturated
alcohol.
Do not use abrasive sponges or products and do not clean with jets of water.
MAINTENANCE
Periodic maintenance and measurement of the combustion efficiency are
required by law and the person in charge of the heating system must ensure
that these checks are carried out by professionally qualified personnel.
Summary of Contents for SUPERAC 1045 SUPERAC 1220
Page 2: ......
Page 5: ......
Page 6: ......
Page 8: ......
Page 9: ......
Page 11: ......
Page 12: ......
Page 14: ......
Page 15: ......
Page 17: ......
Page 19: ...Weight in empty conditions 2100 2350 3450 3850 5200 5800 8000 kg ...
Page 20: ......
Page 22: ......
Page 23: ......
Page 25: ......
Page 27: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 34: ......
Page 35: ......
Page 38: ......
Page 39: ......