background image

Thank you for buying Simco-Ion products. This equipment will meet
your expectations and provide safe operation when it is properly

.

installed and maintained

Checking the contents of package

Please carefully remove the equipment from the carton and inspect. Note
any damage that might have occurred during shipment. Empty the carton to
ensure that small parts are not discarded.

If any damage has occurred during shipment, the local carrier should be
notified at once. A report should be forwarded to SIMCO JAPAN, INC.
The address and other relevant informations are written on the back cover
page.

Package Contents

1

Static bar and high voltage cable typically 3m

1 pc.

)

(

)

2

Mounting Device

)

Model

Device

MEB

MEB Clamp

2 pcs.

MEB CE/RS X1/2 flat plate

2 pcs.

-

(

)

SS-50

X1/2 flat plate

2 pcs.

(

)

SS-50 CE/RS X1/2 flat plate

2 pcs.

-

(

)

A kind of bracket different from the above-mentioned by prior meeting might be
attached.

3

Plastic ties and Plastic blocks

1 set.

)

4

Daily Inspection Label

1 pc.

)

5

Instructions Manual / Warranty

1 pc.

)

Please check if any part is missing or does not have
satisfactory finish. Contact us or our agents
immediately in the event of such occurrence.

-page 2-

CONTENTS

Notes to Users...................................................................................page 1

Receipt of equipment.......................................................................page 2

Contents.............................................................................................page 3

Packing articles and accessories.......................................................page 3

Section 1. General description..........................................................page 4

Section 2. Specifications...................................................................page 5

Section 3. Principle of Operation.....................................................page 7

Section 4. Installation........................................................................page 8

Section 5. Operation........................................................................page 13

Section 6. Maintenance...................................................................page 13

Section 7. Abnormal conditions.....................................................page 17

Section 8. Replaceable parts...........................................................page 18

Section 9. Other products...............................................................page 18

Model A3030/A3031 connectors....................................................page 19

Simco-Ion Air Bars.........................................................................page 20

Simco-Ion EQUIPMENT REPAIR WARRANTY....................enclosed

Explanation of Symbols:

WARNING

ATTENTION / CAUTION

ELECTRIC SHOCK HAZARD

-page 3-

Summary of Contents for Simco-Ion MEB/SS-50

Page 1: ... power supply used The Power unit in turn shall be connected to proper utility line The utility line conditions are indicated on the nameplate of the Power unit The Static Neutralizing Bars and Power units should be mounted in position and all high voltage connections completed with high voltage cables properly secured before the system is connected to the utility lines Flexing the high voltage ca...

Page 2: ... CE RS X1 2 flat plate 2 pcs A kind of bracket different from the above mentioned by prior meeting might be attached 3 Plastic ties and Plastic blocks 1 set 4 Daily Inspection Label 1 pc 5 Instructions Manual Warranty 1 pc Please check if any part is missing or does not have satisfactory finish Contact us or our agents immediately in the event of such occurrence page 2 CONTENTS Notes to Users page...

Page 3: ...owever SS 50 hot or non shockless type bar can have an Ion balance circuit by using Power Unit 4 For the details on the number of eliminators that can be connected with a Power unit please contact our sales division Simco Ion Static Bars use AC high voltage Power units Shockless static eliminators use capacitive coupling to limit the amount of electrical energy that can be drawn from an electrode ...

Page 4: ...ct our sales division Weight of bars shown in the table above is only approximate High voltage cable is normally not shielded Standard high voltage cable is covered by semi transparent polyethylene tube and grey colored spiral Silicone cable is not approved by either Japanese Ministry of Labor or UL USA For any further information on any of the products please contact our sales division SECTION 3 ...

Page 5: ... necessary on both the surfaces Two Static Bars will be required one for each surface In case the speed of the object is high it is better to have more than one bar The distance between two nearest faces of two bars placed side by side should be about 25 mm Fig 2 Static bar location page 8 4 2 Mounting Static bars may be provided with mounting brackets that can be bent and twisted to support them ...

Page 6: ... points Attach the high voltage cable to the machine frame etc by using cable holding plastic blocks and plastic wire tie Shielded cables do not need any plastic block 3 The power unit cable and the static bar should be located in an easily accessible place such that the any replacement in future can be easily carried out CAUTION High voltage cable is special pulling sharp bending could damage it ...

Page 7: ...le connection at the power unit Proper connector attached to the high voltage cable terminal is used to connect the high voltage cable to the Power unit For details please refer to the instruction manual for your Power unit If necessary please contact us for a copy of the instruction manual for the Power unit SECTION 5 Operation An ON OFF switch on the Power unit is used to turn a static bar on an...

Page 8: ...r if there is any other sign of abnormality In this case the bar might have to be replaced Spark test WARNING When conducting the following test be certain that no flammable solvents or gas is in the ambient air Also switch off any computer or sequencer to protect against electrical transients and noise Steps 1 Use a small screw driver 2 Switch on the Power unit Holding the insulated part of the s...

Page 9: ...ON Each needle electrode in shockless bars is insulated During insulation resistance measurements each needle should be tested separately In hot bar all needle electrodes are directly connected to high voltage Disconnect the cable at the Power unit end while carrying out the resistance measurements In insulation resistance measurements above high voltage cable end refers to the spring belonging to...

Page 10: ...35 F R35 R Ionizing air gun Hand gun for neutralization and HBA ES TOP GUN 3 blowing of dust COBRA GUN Ionizing blower Wide area application for rugged XC PC FPD industrial use AS31 AS21 CENTURION SERIES Besides there is a variety of other available products such as conductive mat conductive floor foot checker etc Please ask us or our agents in your area for details page 18 Model A3030 A3031 high ...

Page 11: ... IN on the valve Air tube outside diameter is 8 mm If air bar is short 100 mm change the tube dia from 8 mm to 6 mm using a reducer Recommended air pressure is 0 01 0 7 MPa Normally 0 3 MPa is used If air bar is 1 m long use two valves one on each side of the air bar Fig 13 Long static bar with valves on both ends 2 Air flow rate Fig 14 Variation of air flow rate with pressure for different air ba...

Page 12: ... installed altered has received damage through abuse carelessness accident connected to improper line voltage or has been serviced by anyone other than an authorized factory representative The warranty does not apply when Simco Ion parts and equipment have been energized by other than appropriate Simco Ion Power unit or generator or when Simco Ion Power unit or generator has been used to energize ...

Page 13: ......

Reviews: