ASSEMBLING STACKED OVENS
Unpack the ovens and the stack kit
V
. Position the oven to be used as the bottom oven on its left
side
for access to the oven bottom, taking care not to scratch or damage it.
Attach the four leg
RUFDVWHU
assemblies with the 24 bolts and lockwashers (six per leg).
Place the lower oven (with legs
RU
FDVWHUV
) on the floor and remove two
7
/
16
" (11 mm) diameter
knockouts on each
side of the top
H[WHULRUSDQHO
.
5HPRYHNQRFNRXWIURPWRSRYHQEDVH
Install two locating studs to the bottom of the top oven per stacking kit instructions.
Move the oven with legs
RUFDVWHUV
to the installed position. Place the upper oven on top of the lower
oven using
the locating studs.
Remove the optional rear panel, if provided, from the TOP oven.
5HPRYHWRSRYHQYHQWJXDUG
Install
the Stacking Flue (Fig. 3) with
the four screws provided. Replace the top oven rear panel, if
provided.
STACKING FLUE