SPECIFICATIONS

INSTALLATION

TOOLS NEEDED:

One (1) flathead screwdriver, and one (1) pipe wrench.

For Remote Installations a level and power drill will be required.

Electrical Ratings

Series PS-802 for Steam Boilers

Electronic circuitry prevents nuisance burner cycling:

15 second Delay on Make (DOM)

10 second Delay on Break (DOB)

Conductive liquid required
(water/glycol mixtures up to 50% concentration may
be used)

Automatic reset after power outage

Maximum Pressure:

15 psi (1kg/cm

2

)

All models include a provision for adding an alarm or
automatic water feeder.

Series PS-852 for Hot Water Boilers

No time delays provided

Conductive liquid required
(water/glycol mixtures up to 50% concentration
may be used)

Automatic reset after power outage

Maximum Pressure:

160 psi (11.2kg/cm

2

)

Maximum Water Temperature:

250˚F (121˚C).

All models include a provision for adding an alarm
or automatic water feeder.

Control Voltage:

24 VAC

HZ:

50/60

Probe Sensitivity:

For models with red (low water) and amber (test) 
lights: 3,000 ohm

For models with red (low water) and green (power) 
lights: 7,000 ohm

Control Power Consumption:

For models with red (low water) and amber (test) 
lights: 2 VA

For models with red (low water) and green (power) 
lights: 1.7 VA

Motor Switch Rating (Amperes)

Model

Voltage

Full Load

Locked Rotor

Pilot Duty

24 VAC

24 VAC

50 VA at

24 VAC

The Series 800 controls provide con-
tinuous protection against low water
conditions for residential, commercial
and industrial applications. Newer
models feature increased probe 
sensitivity to prevent nuisance shut-
downs, and a new test feature that
diagnoses shorted probe problems at
installation. The user-friendly diag-
nostic LEDs simplify installation and
troubleshooting, ensuring proper
operation and saving time.

Amber

(Test)

Red

(Low Water)

Older Models

New Models

Temperature:

Storage: -40˚F to 120˚F (-40˚C to 49˚C)
Ambient: 32˚F to 120˚F (0˚C to 49˚C)

Humidity:

85% (non-condensing)

Electrical Enclosure Rating:

NEMA 1 General Purpose

Summary of Contents for McDonnell & Miller PS-802 Series

Page 1: ...in series with all other limit and operating controls installed on the boiler After installation check for proper operation of all of the limit and operating controls before leaving the site We recom...

Page 2: ...arm or automatic water feeder Control Voltage 24 VAC HZ 50 60 Probe Sensitivity For models with red low water and amber test lights 3 000 ohm For models with red low water and green power lights 7 000...

Page 3: ...iler manufacturers instructions to determine suitable tapping for the probe For Hot Water Boilers 1 Refer to boiler manufacturers instructions to determine suitable tapping for the probe 2 Locate prob...

Page 4: ...following steps 1 Using a level draw a horizontal line at the location and mark two positions 1 1 4 31 75 mm apart on the horizontal line 2 Drill a 0 113 dia hole 1 2 13 mm deep in each position on t...

Page 5: ...of the probe and tighten the wing nut to 1 2 ft lb 65 N m 3 Using a flathead screwdriver attach a suitable green 16 AWG wire not provided to the green ground screw X provided at the base of the probe...

Page 6: ...s of electrical fittings and conduit c Based on the Boiler s Control Circuit voltage and the required input voltage of the LWCO select proper wiring diagram and proceed to that page Boiler manufacture...

Page 7: ...internal wiring Connect plug A of wiring harness to receptacle B Check to make sure factory supplied jumper is installed between terminals H and C PS 802 852 using Harness Connection PS 802 852 using...

Page 8: ...e amber LED BB glows dimly the water level is above the probe 2 If the amber LED BB is off the water level may be below the probe or the water is too pure and may require the addition of boiler water...

Page 9: ...r with a manual reset low water cut off Manually Testing Control For Series PS 802 PS 802 M with Red Low Water and Green Power Lights a Before filling the system turn on the electric power to the boil...

Page 10: ...Red light will remain ON The burner will remain OFF Testing Control Using Test Button continued b Now fill the boiler with water For Series PS 852 auto reset units only 1 When water touches the probe...

Page 11: ...ting Control Using Test Button e Depressing test button with water on probe manual reset units only Must depress and hold test button for more than 2 seconds to activate test cycle 1 When test cycle i...

Page 12: ...ensure adequate conductance Troubleshooting Replace Probe if Teflon insulator is cracked or worn Probe is loose Failure to follow this caution could cause property damage personal injury or death CAU...