10.10.2 DGS static degreaser - Layout
1 Cover
(glass-reinforced
plastic)
2 Inlet pipe DN 125 (DGS 50 and 100), DN 160 (DGS 150)
3 Tank
(glass-reinforced
plastic)
4 Outlet pipe DN 100
5 Fat collection area
10.10.2.1 Positioning, hydraulic connections, completion of excavation
1 Sand or pozzolana
2 Inspection pit with cast-iron manhole cover
3 Inspection pit (provided by installer)
4 DGS
degreaser
5 Imhoff tank (for Depurbox MAXI and DUO)
6 Depurbox
7 DBF filter (if present)
8 Inspection pit (provided by installer)
To install, proceed as follows:
1
Dig a hole with a width not exceeding twice the diameter.
2
Prepare a level compacted bed in sand or pozzolana (20-30 cm).
3
Make sure the measurements are correct and adjust the thickness of the sand so as to ensure the various wastewater entry
and exit pipes are aligned with the entry and exit points of the degreaser.
4
After aligning it, make the hydraulic connections using the PVC piping and glue.
5
Half fill the degreaser with water to stabilise its position.
6
Fill the hole with 30 cm layers of sand or pozzolana, moderately wetting each layer and carefully compacting the support.
7
Install the inspection pit (if required) over the degreaser cover.