![ITRON OpenWay Intelis Installation Manual Download Page 16](http://html1.mh-extra.com/html/itron/openway-intelis/openway-intelis_installation-manual_2096053016.webp)
Chapter 4 Proving and Calibrating the Intelis
Meter
This section provides information about the Intelis meter proving, testing, and calibrating
process.
Warning
: Follow your company's standard operating procedures regarding the use
of personal protection equipment (PPE). Adhere to guidelines issued by your
company in addition to those contained in this document when proving meters.
The Intelis meter Test Mode and a proving station are used to confirm the calibration and
accuracy of the meter.
Note
: Test Mode is used in a meter shop or by a regulatory body. Some meter configuration
is required for the meter to communication with the prover type.
Proving the Intelis meter requires attaching the prover cable between the meter and the
proving station. After the accuracy of the meter is confirmed or calibration is complete, the
proving cable is removed and the meter returns to normal operation.
Note
: Temper meters unpackaged and uncapped in the proving area for 24 hours prior to
the testing. Some configuration of the meter is necessary for the prover station type. This
configuration is completed using the FDM configuration file.
Proving accessory
Itron part number
Intelis prover cable
CFG-7100-001
Prover types
There are a variety of prover types that can be used to prove the Intelis meter. Two interface
options are shown in the following illustrations. For your specific prover, see the
documentation for your prover type.
OpenWay® Riva Intelis Gas Installation Guide TDC-1782-000
13
Proprietary and Confidential