37
Installation
6 START-UP AND REGULATION
FIXING: Check that the pump is properly secured
HYDRAULIC CIRCUIT CHECK: Check that all valves are open, and that the priming and relief
valve outlets are diverting the liquid to a container
PUMP CHECK: Make a visual/auditory check of the correct operation of the pump.
PRIMING: To facilitate pump priming, open the priming valve.
OVERPRESSURE PROTECTION: Adjust the safety, overpressure or pressure relief valve to the
desired pressure to protect the installation, while never exceeding the nominal pressure of the
pump.
Summary of Contents for DOSmart AC
Page 1: ...ENGLISH ...
Page 46: ......