background image

connector, it must be set to the non-active state in the target via a pull-up resistor. If not then
the JTAG TAP state machine remains in reset and debugging is not possible.

Signal direction definition:
O - Output from the Active Probe to the target microcontroller
 I - Input to the Active Probe from the target microcontroller

–  Trigger  connector  –  Provision  for  future  functional  extensions.  No  functionality  at  the

moment. 

– The indicator light provides the status of the Active Probe as follows:

·

Permanently green - Powered On and ready
to use.

·

Blinking green - Establishing connection
with the BlueBox.

·

Blinking blue - Reprogramming SPLASH.

·

Permanently magenta - Golden image
loaded and ready to use.

– FNet connector, that connects the Active Probe to the iC5700 BlueBox. The FNet cable is

delivered with the Active Probe.

When  powering  on  the  system,  switch  the  iC5700  on  before  powering  on  the  target
system. When powering down the system, power off the target before powering off the
iC5700!
FBridge port is not Ethernet port!
Use only original iSYSTEM accessories for powering and  connecting  with  the  iC5700.
Consult with iSYSTEM before attempting to use any other accessory.

Target connector 

The target should feature a matching part, for example, Samtec part number: ASP-137973-01.

Summary of Contents for Aurora MPC5 Series

Page 1: ...MPC5x SPC5x Aurora Active Probe User Manual V1 5 ...

Page 2: ...ll rights are reserved Duplication of these documents is allowed for personal use In all other cases written consent from iSYSTEM is required iSYSTEM AG All rights reserved All trademarks are property of their respective owners iSYSTEM is an ISO 9001 certified company www isystem com ...

Page 3: ...fety notice 6 Package content 7 Specifications 8 Operation 9 14 pin 2 54mm JTAG Converter 11 Active Probe and the iC5700 connecting guidelines 12 Setting Debug Interface Voltage Levels 13 Further Active Probe Settings 14 Lane link speed 15 Accessories 16 ...

Page 4: ...ce interface as well as combine data captured by the IOM6 accessories Various third parties also provide software tools to perform advanced worst time execution analysis based upon the data winIDEA can export When a Real Time Operating System RTOS is in use the state of the RTOS and its tasks can also be visualized More information isystem com winideaide testIDEA testIDEA environment simplifies th...

Page 5: ...Downloads page at http www isystem com ...

Page 6: ...o avoid potential damage caused by any voltage difference between the device and the target system Use proper overvoltage protection Please ensure proper protection to avoid exposing the BlueBox device or the operator to overvoltage surges e g caused by thunderstorm mains power Do not operate without cover Do not operate the device with cover removed Avoid circuit and wire exposure Do not touch ex...

Page 7: ...Package content The MPC5x SPC5x Aurora Active Probe is delivered with the following components Infineon MPC5x SPC5x Active Probe 1m FNet Cable User Manual Ordering code IC57150 Ordering code BB FNET 100 ...

Page 8: ...RATION Communication interface to BlueBox iSYSTEM proprietary FNet Debug signal valid input voltage range 3 3V max 3 6V Power consumption Max 1 5W dependent on operation mode Number of supported AGBT lanes Up to 4 Maximum AGBT bitrate 5Gbps AGBT clock source options Active Probe PROTECTION Debug signals 33 Ohm series termination protection resistors ESD protection devices VREF 1k Ohm input impedan...

Page 9: ... TX3 19 20 nPORST Power On Reset O AGBT TX3_N TX3 21 22 nRESET Reset IO Ground GND 23 24 GND Ground Not Connected NC 25 26 AGBT CLK_P AGBT Clock O Not Connected NC 27 28 AGBT CLK_N AGBT Clock O Ground GND 29 30 GND Ground Not Connected NC 31 32 NC Not Connected Not Connected NC 33 34 NC Not Connected 34 pin ERF8 MPC5x SPC5x target pinout Blue colored signals are Aurora trace signals The JCOMP is a...

Page 10: ...to use Blinking green Establishing connection with the BlueBox Blinking blue Reprogramming SPLASH Permanently magenta Golden image loaded and ready to use D FNet connector that connects the Active Probe to the iC5700 BlueBox The FNet cable is delivered with the Active Probe When powering on the system switch the iC5700 on before powering on the target system When powering down the system power off...

Page 11: ... 7 8 nPORST Power On Reset O IO Reset nRESET 9 10 TMS JTAG O I Reference Voltage Vref 11 12 GND Ground Not Connected NC 13 14 nJCOMP JTAG TRST optional O 14 pin 2 54mm MPC5xxx SPC5 pinout Mandatory pins on the microcontroller side are GND VDD RESET TMS TDI TDO and TCK The JCOMP is an optional pin Some microcontrollers don t have this pin Internally this is actually the JTAG TRST which resets the J...

Page 12: ... both Refer to winIDEA Help www isystem com groundingwire for more information 2 Connect the iC5700 Power Supply to the mains outlet and the iC5700 3 Connect the iC5700 to the PC via the supplied Ethernet or USB 3 0 cable 4 Connect the Active Probe to the iC5700 FNet Port through the supplied FNet Micro Cable If a cable longer than 1 0m is required for example when debugging an ECU in a vehicle or...

Page 13: ... voltage levels for the debug interface are configured within winIDEA via Hardware menu CPU Options Hardware When the microcontroller target supplies 5 0V to the Vref signal pin 1 use the radio button selection to select the Vref option instead ...

Page 14: ...ring code IC50150 or 38 pin Mictor MPC5xxx Nexus 16 bit D Adapter Ordering code IC50152 In order to switch from the default DTM interface use to the Active Probe use open Hardware menu Options FNet tab 1 Click Refresh in Hardware menu Options FNet Currently connected FNodes 2 Click Create configurations for connected FNodes Selected device is displayed in FNode configurations Configuration is crea...

Page 15: ... Hence once the Analyzer trace operation e g trace or profiler or coverage is confirmed with the default setting higher Aurora link speeds should be tested and the highest operational speed then selected for usage This way the Active Probe will be configured for maximum possible Analyzer session time Different speeds are available The detailed configuration settings for the Active Probe can be sel...

Page 16: ...041 IOM6 ADIO IC57125 ARM HSSTP Active Probe IC57125 1 ARM HSSTP II Active Probe IC57163 Infineon DAP DAPE Active Probe IC57164 Infineon AGBT Active Probe IC57150 MPC5x SPC5x Aurora Active Probe MPC5x SPC5x Active Probe Accessories Ordering Code Description BB FNET 100 1 0m FNet Cable BB FNET 300 3 0m FNet Cable BB FNET 500 5 0m FNet Cable IASAM34MPCPIN14 14 pin 2 54 mm JTAG Adapter Please refer t...

Page 17: ... information provided in this document at the time of publishing Whilst iSYSTEM reserves the right to make changes to its products and or the specifications detailed herein it does not make any representations or commitments to update this document iSYSTEM All rights reserved ...

Reviews: