![Isuzu AA-6HK1T Workshop Manual Download Page 185](http://html1.mh-extra.com/html/isuzu/aa-6hk1t/aa-6hk1t_workshop-manual_2094387185.webp)
6C–10
ENGINE FUEL
9. Set the nozzle holder to the nozzle tester.
10. Operate the nozzle tester. Measure the first nozzle
opening pressure.
11. If the first nozzle opening pressure is not as
specified, disassemble the nozzle holder and
remove the shim. Replace the shim with a new shim
that adjusts the opening pressure to the specified
level.
CAUTION: Use a micrometer to measure shim
thickness.
•
First nozzle opening pressure adjusting shims
Part No. (ZEXEL)
Thickness (mm)
150590-0600
0.40
150590-0700
0.50
150590-0800
0.52
150590-0900
0.54
150590-1000
0.56
150590-1100
0.58
150590-1200
0.60
150590-1300
0.70
Full needle valve lift confirmation
1. Install the gasket (1) and plug (2) to the adjustment
retaining nut.
Gasket:
026508-1140 (ZEXEL)
Plug:
157892-1600 (ZEXEL)
2. Position the nozzle holder with the nozzle facing
down. Install the dial gauge holder to the nozzle
holder.
Dial gauge holder: 157892-4400 (ZEXEL)
Nozzle tester
Nozzle holder
040MV030
Thickness
φ
2.6
φ
6.2
040LX010
2
1
040EY00072
1
040EY00073
Summary of Contents for AA-6HK1T
Page 1: ...AA 6HK1T BB 6HK1T...
Page 2: ...ISUZU MOTORS LIMITED AA 6HK1T BB 6HK1T ENGLISH 9806 2200 ISSUE 1 MAY 05 WORKSHOP MANUAL...
Page 3: ...0 0 9806 2200 Notes...
Page 41: ...MEMO...
Page 51: ...MEMO...
Page 57: ...6A 6 ENGINE MECHANICAL 2 1 052EY00007...
Page 73: ...6A 22 ENGINE MECHANICAL 1 041EY00015...
Page 77: ...6A 26 ENGINE MECHANICAL 8 4 1 5 9 10 6 2 3 7 11 010EY00008...
Page 112: ...ENGINE MECHANICAL 6A 61 011MX014...
Page 175: ...MEMO...
Page 217: ...MEMO...
Page 233: ...MEMO...
Page 241: ...MEMO...