![Isuzu AA-6HK1T Workshop Manual Download Page 111](http://html1.mh-extra.com/html/isuzu/aa-6hk1t/aa-6hk1t_workshop-manual_2094387111.webp)
6A–60
ENGINE MECHANICAL
19. Install the intake cover with new gasket to the
cylinder head.
1. Install the intake cover bolts with the distance pipe
and the mounting rubber.
2. Tighten the intake cover bolts to the specified
torque a little at a time in the numerical order
shown in the illustration.
Torque: 15 N·m (1.5 kg·m/11 lbft)
20. Install the intake pipe with new gasket to the intake
cover.
Tighten the intake pipe bolts to the specified torque.
Torque: 20 N·m (2.0 kg·m/14 lbft)
22. Install the bridge to the bridge guide.
•
Apply engine oil to the bridge.
26. Install the bridge cap to the bridge.
•
Apply engine oil to the bridge cap.
1
2
3
1
4
027EY0023
12
7
4
3
1
2
5
A
6 9
10
11 8
027EY0024
13
9
5
1
4
8
12
14
11
7
2
6
10
3
Intake cover
025MX016
025EY00018
Summary of Contents for AA-6HK1T
Page 1: ...AA 6HK1T BB 6HK1T...
Page 2: ...ISUZU MOTORS LIMITED AA 6HK1T BB 6HK1T ENGLISH 9806 2200 ISSUE 1 MAY 05 WORKSHOP MANUAL...
Page 3: ...0 0 9806 2200 Notes...
Page 41: ...MEMO...
Page 51: ...MEMO...
Page 57: ...6A 6 ENGINE MECHANICAL 2 1 052EY00007...
Page 73: ...6A 22 ENGINE MECHANICAL 1 041EY00015...
Page 77: ...6A 26 ENGINE MECHANICAL 8 4 1 5 9 10 6 2 3 7 11 010EY00008...
Page 112: ...ENGINE MECHANICAL 6A 61 011MX014...
Page 175: ...MEMO...
Page 217: ...MEMO...
Page 233: ...MEMO...
Page 241: ...MEMO...