background image

  

 

MEASUREMENT AND ASSEMBLY MANUAL 

 

Instruction validity: as of 1 August 2013 

11 

RTS MOTOR:

 

The motor cable has 3 conductors: 

 

blue = phase/neutral conductor, 

 

brown = phase/neutral conductor, 

 

yellow-green = ground. 

 

Motor switching can be installed in two different ways: either using a switch, or using a programming set (on request). 

The 

instructions for programming and adjustment of end switches are shown in a separate manual.

 

To set up the end switch, first turn on the motor to roll the roller blind down and set the required maximum down position, 

then run the motor in opposite direction to draw the roller blind up. 

 

Prior  to  final  connection  and  operation,  check  if  the  system  works  properly.  Operate  the  roller  blind  for  at  least  two 

consecutive cycles and check the function of thermal disconnection after 4 minutes of continuous operation. In case of any 

problems, study Chapter 8. 

 

NOTE: There is a risk of compression in case a hand is trapped between the fabric and the upper box during the 

roller  blind  updrawing.  Before  operating  the  roller  blind,  move  your  hands  outside  of  the  movement  range  to 

prevent compression. Vibrations or excessive noise indicate damage or faulty installation of the roller blind. 

 

8.2 TESTING 

To provide for proper function of the roller blind, check if the winding drum is perfectly level after installation. 

Following the roller blind installation, check if the end user understands the method of operation of the roller blind, and give 

this manual to the user for future reference. 

8.3 REMOVAL OF WINDING DRUM FOR MAINTENANCE 

Removal of the winding drum and motor from the upper box is necessary only if the upper box 

is installed at the front. Suspended roller blinds are supplied disassembled. 

 

NOTE: Prior to commencing the steps described below, disconnect the motor cables from the 

main  switch  to  prevent  inadvertent  motor  actuating.  On  both  sides,  the  box  consists  of  side 

board  (1),  fixed  part  (2)  and  removable  cover  (3).  If  it  is  necessary  to  remove  the  drum, first 

remove two screws (4) 

– one on each side – and remove the removable part of the box (3).  

 

The roller blind components may vary in accordance with the roller blind dimensions and the motor type. The winding drum 

is attached to the side boards as follows: 

Summary of Contents for SCREEN ZIP

Page 1: ...nt of an opening As a rule indicate the width of the opening which is to be shaded in the order form 2 x 40 mm Dimensions outside the stipulated limits must be consulted with the manufacturer H height...

Page 2: ...s Power supply Electric power mains 230 V AC Frequency 50 60 Hz Voltage fluctuation tolerance 10 Interference level below 70 dB Operating conditions Ambient temperature 5 C through 50 C Relative humid...

Page 3: ...tallation and wiring of the roller blind may only be carried out by qualified and authorised personnel Any intervention however small in the power supply requires a qualified electrician Faulty wiring...

Page 4: ...ind function regularly Do not use the roller blind if maintenance is necessary 5 UNPACKING The SCREEN ZIP system is supplied partially assembled only the guide bars or cord accessories and ceiling bra...

Page 5: ...ller blind can be installed using two different methods 1 direct installation to guide bars attached to a ceiling or wall 2 installation to a ceiling or frontal installation using special attachment b...

Page 6: ...e upper box and the rear wall but the bracket is visible and not visually attractive installation of a bracket with wedges in the back is more aesthetically desirable but requires at least 5 cm of spa...

Page 7: ...ed at least 25 and 50 mm from the ceiling or any obstacle exceeding the box Attach brackets using screws and components suitable for the type of structure onto which they are to be attached metallic s...

Page 8: ...1 INSTALLATION OF GS40 GUIDE BAR For model ZIP only one type of guide bars is available GC20 The bar is supplied with pre drilled holes as per order from the front or from the side Placement of holes...

Page 9: ...For exterior roller blinds installed with a sleeve passing through a wall and with a crank rod in the interior it is necessary to calculate the exact position of the hole for a 30 cm angular rod 15 A...

Page 10: ...any persons or objects impede the movement of the roller blinds Do not connect two or more motors to the same control unit without using a group control unit Do not use light switches Do not connect...

Page 11: ...operating the roller blind move your hands outside of the movement range to prevent compression Vibrations or excessive noise indicate damage or faulty installation of the roller blind 8 2 TESTING To...

Page 12: ...eration can cause damage to the roller blind 9 1 SAFETY DEVICES The motor includes a disconnecting overheating protection Thermal disconnection is activated after approx 4 6 minutes of continuous oper...

Page 13: ...sive tape directly onto the winding drum on the side opposite to where the fabric is moving Repeat applying further adhesive tape layers until the defect is completely removed Drum cover displacement...

Page 14: ...ing operation Otherwise contact technical support Increased noise Motor failure Disconnect the motor test it and replace if necessary Motor blocks after a long period of service The motor is in the th...

Reviews: