
Page 6 of 43
Low Temp Furnace Model ITL-M-17701 13-07/20
UNPACKING
SECTIONAL VIEW OF TRANSPORT CLAMP
A
NUT
B
CHANNEL
C
TUBE
D
STUD
E
WASHERS
F
RUBBER EXPANDING BLOCK
G
NUTS
EVERY EFFORT HAS BEEN MADE TO PACKAGE THIS UNIT FOR TRANSPORT AND TO ENSURE ITS
GOOD CONDITION ON ARRIVAL AT ITS DESTINATION.
BEFORE COMMISSIONING IT IS NECESSARY TO REMOVE THE FURNACE CORE TRANSIT CLAMP.
TO AVOID DAMAGE PLEASE FOLLOW INSTRUCTIONS:
1.
Slacken the central nut using the required tube spanner; the insertion of a screwdriver through the
tube spanner will prevent the central stud turning.
2.
Remove the 3 screws securing the transit clamp to the top of the unit. Slacken each screw equally
by degrees and then completely remove the screws.
3.
Gently lift the transit clamp vertically; a central tube which has secured the furnace core will then
slide out. The 3 screws should then be replaced in the top of the unit
4.
Normal commissioning procedure may now be followed.
5.
Keep the transit clamp and use it if the furnace is ever transported.