15. Transport 

 

·

 

Warranty!

  Before  to  make  any  type  of  movement,  to  switch  off  the  motor 

(gasoline  or  diesel)  or  disconnect  the  machine  removing  the  socket  (electric 
system). 

 

·

 

Warranty!

  In  case  of  lifting,  to  use  only  the  point  "A"  of  hooking  (see  the 

picture 09). 

 

·

 

Warranty!

 The machine is moved manually of weight by two persons for the 

movements  in  the  building  site,  using  the  handle  and  the  proper  pipe  “B”  to 
facilitate the same movements (see the picture 10). 

 

·

 

To  put  the  machine  correctly  on  the  means  of  transport,  to  avoid  that  it  can  tip 
over or sliding. 

 

 

 

 

Picture 09  

 

 

 

 

 

Picture 10 

 

 

 

   

 

 

 

 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 

Summary of Contents for L030002

Page 1: ...1 CONCRETE POWER TROWEL L030002 USER MANUAL AND SPARE PARTS LIST...

Page 2: ...book Isoplam s r l Building and road equipments Address Via E Mattei 4 31010 Maser TV Italy Phone 039 0423 925023 Fax number 039 0423 926119 E mail info isoplam it Web www isoplam it CONCRETE POWER T...

Page 3: ...hine installation 6 Mounting and dismounting of the blades and smoothing plate 7 Security working instructions 8 Working 9 Controls before starting 10 Starter 11 Instructions for use 12 Stopping 13 Ma...

Page 4: ...een designed and that is for the levelling and finishing of the concrete floors Every other use is considered improper and dangerous Consequently the manufacturer not is responsible for possible damag...

Page 5: ...dults who are both physically and mentally suitable He must make sure that these persons are able to use correctly the machine The Trowels can be started only if all performances and safety norms into...

Page 6: ...ancing allows without to strive the correct working The rudder is adjustable to height so that the operator can work in a more comfortable position or to facilitate the transport reducing the encumbra...

Page 7: ...TIC ENVELOPE WITH N 17 KEY FOR THE MOUNTING AND DISMOUNTING OF THE BLADES To execute with caution the outside packing elimination so to avoid any damage to the machine above all at the rubber pipes an...

Page 8: ...the blades 7 Security working instructions The work place must be perfectly in order without risks and well lit Warning To remove the foreign persons from the neighbourhoods before to begin the level...

Page 9: ...the working has been started too soon To not stay long in the same place to not cause potholes of the machine The FINISHING JOB follows the FLOATING JOB using only the finishing or the combination bl...

Page 10: ...t the job place is perfectly dry before to start the motor SECTION FOR ELECTRICAL MOTORS Warning To verify that the feed voltage of machine is in accordance with voltage of net see the identity namepl...

Page 11: ...e handle that will never permit the motor starting in lowered position this system is usually called dead man 4 To slowly pull the rope starting until to find the compression resistance to continue to...

Page 12: ...ccelerating gradually those put themselves in rotation until to reach the desired working speed To work advance happens very simply It is sufficient to raise or to lower just the handle to drive the m...

Page 13: ...made by technical skilled staff An use not corrected not original spare parts and modifications not authorised exclude the manufacturer from every responsibility and guarantees Warranty It is obligato...

Page 14: ...d of advance If the motor not starts diesel or gasoline to verify the fuel on its fuel tank To verify and to clean the air filter possibly to change it To verify and to clean the fuel filter possibly...

Page 15: ...se of lifting to use only the point A of hooking see the picture 09 Warranty The machine is moved manually of weight by two persons for the movements in the building site using the handle and the prop...

Page 16: ...S ROTATION SPEED 50 110 rpm STANDARD ACCESSORY 4 FINISHING OR COMBINATION BLADES at choice MEASURES see the picture 11 A B C D L030002 1 800 x 920 x 800 x 1 020 17 Spare parts list For every request o...

Page 17: ...17...

Page 18: ...OL OR ELECTRIC MOTOR ZINC PLATED SCREWW T C E I M6X50 LOCK NUT M 6 MOTOR PROTECTION ZINC PLATED SCREW T E M 8X35 CENTRIFUGAL PULLEY BELT A 29 ZINC PLATED WASHER M 6X30X4 ZINC PLATED NUT M 6 MECHANICAL...

Page 19: ...1A106 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ELASTIC PLUG D 6X30 PULLEY ENDS SHEATH D 8 SHEATH S PROTECTION ENDS SHEATH D 8 CLOSED HANDLE D 25 ACCELERATOR HANDLE SHEATH S PROTECTION ACCELERATOR P...

Page 20: ...20...

Page 21: ...1 1 1 1 1 REDUCTION GEAR LOWER WASHER BURNISHED SCREW T E M 10X30 ZINC PLATED AND TOOTHED WASHER D 10 5X30X5 SHAFT REDUCTION GEAR SMALL KEY 10X8X40 PRINCIPAL SHAFT SHAFT REDUCTION GEAR SMALL KEY 8X7X7...

Page 22: ...22 Mechanical Cruise Page from 2 to 2 ITEM CODE N DESCRIPTION 30 31 32 33 2122A004 0722A013 2122A004 3025A009 1 1 1 1 DETACHER PULLEY D 130XA1 DETACHER PULLEY REDUCTION GEAR SMALL KEY...

Page 23: ...23...

Page 24: ...5 6 7 8 9 0122002 3029001 2901003 3029004 3029005 1601002 1601004 2802001 0820002 1 1 1 1 2 2 1 2 4 BELL BOTTOMED D 92x1A SEEGER EST D 35 BEARING 6007 2RS SEEGER INT D 62 SEEGER EST D 10 JAW WITH BRAK...

Page 25: ...ons 2006 42 CE Concerning the rapprochement of the legislations of the member States relative to the machines 2014 30 CE Concerning the rapprochement of the legislations of the member States relative...

Page 26: ...cording with the security norms under indicated UNI EN ISO 12100 1 Security of the machinery Fundamental concepts general principles of planning Part 1 Terminology of base methodology UNI EN ISO 12100...

Page 27: ...jects protection due risks to surfaces edges and angles due risks at the vibrations due risks at the accidents and explosions due risks to the noise 05 PROTECTIONS General requirements risks of the fi...

Page 28: ...28 ISOPLAM S r l Via E Mattei 4 31010 COSTE DI MASER TV ITALY Tel Export 039 0423 925023 Fax 039 0423 926119 WEB site www isoplam it e Mails info isoplam it...