FREIGHT, DELIVERY, AND ASSEMBLY OF THE MACHINE
Attention: always work with working gloves!!
After freight shipping, some items may need to be assembled to the machine, such as the wheels. The
axles are attached to the frame with a set screw, as shown in pict 13 position 21. Make sure the axel
extends past the set screw a couple inches, but keep the tire away from the frame so it doesn
’
t rub.
Mount the sprinkler with BSP threads to the cart as shown in pict 14 position 22.
PREPARATION OF THE MACHINE BEFORE USE
Check the gear box oil level and if needed add SAE90 oil. Fill to the black plug on the left side of the
gear box. The red plug on top is a vent.
Lubricate the machine at all greasing points (look at the symbol page 3) and also the crown gear of the
drum. Main points to lubricate: crown gear, brake on the gear box, & endless screw.
It
’
s necessary to lubricate/grease every 20 working hours!!!
Check the machine and the cart tire pressure (if inflatable): look at the proper pressure on the tires and
if necessary adjust it.
PICT. 13
21
PICT. 14
22
PICT. 05
08
09
PICT. 11
15
16
17
PICT. 04
06
Page 9
Summary of Contents for SPORT Series
Page 5: ...Page 5...