17
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
TUBE RETAINING PINS
BAFFLE BOARDS
SECONDARY TUBES X4
ANGLE UPWARD
AND SLIDE LEFT
SECONDARY TUBE
RETAINING PIN
SEE DETAIL A
DETAIL A
RETAINING PIN NOTCHES
1
2
3
4
CAPTURING END
SECONDARY TUBE
RETAINING PIN
SEE DETAIL A
DETAIL A
RETAINING PIN NOTCHES
1
2
3
4
CAPTURING END
SLIDE SECONDARY
TUBE TO RIGHT
SECONDARY TUBE AND BAFFLE BOARD REPLACEMENT
• Gently lift front baffle board upward and place on rear baffle board.
• Starting front to rear, locate secondary tube retaining pin and rotate
counter clockwise; pull pin toward front of stove, allowing capturing
end to slide through retaining pin notches as shown.
• Slide secondary tube to the right, releasing it from the left side. Angle
left side upward, and slide left to release from right side. Remove
tube from stove
• Repeat process for secondary tube number two
• Gently lift top baffle board and slide forward; tilt left side up and
left slightly, allowing the right side to drop into the firebox area for
removal. Repeat process for rear baffle board
• Secondary tubes three and four can now be removed in same fashion
as tubes one and two
• Reinstall baffle boards and secondary tubes in reverse order. *Note-
Secondary tube number one has larger holes, as the remainder of
the tubes are the same.
Baffle Boards
Secondary Tubes
(4 ea.)
Tube Retaining
Pins
Angle Upward
and Slide Left
Slide Secondary
Tube to the Right
Retaining Pin
Notches
Capturing End
Secondary Tube
Retaining Pin
See Detail A
DETAIL A
Planning Installation
Safety and General
Installation
Operation
Maintenance
Troubleshooting
Parts / Accessories
Figure 25 - Secondary Air Tubes
Installation
Figure 26 - Secondary Air Tube Retainers