background image

Assembly & Operating Instructions 

Ironmaster IM2000 

Assembly and Use Instructions 

The IM2000 is a self-spotting weight training system. Built in upper and lower pulleys allow for 
various cable exercises and the lifting bar can quickly and easily be locked out at many levels for 
safety without the need for a spotter for lifting and pressing exercises. Secondary safety stops 
add even more safety if needed. Bar and weight storage bars will hold Standard or Olympic style 
weight plates. The IM2000 is designed to be used in conjunction with Ironmaster products and 
attachments, but can accommodate other brands of plates, cable attachments and benches. 
Weight rating is 1000 lbs/450 KGS for the frame and lifting bar. Cable System is rated for 350 
lbs/159 KGS. Ironmaster recommends 2 people for assembly. Refer to this manual or the Iron-
master web site for further details regarding usage of the IM2000 and be sure to understand all 
safety warning labels.  

Summary of Contents for IM2000

Page 1: ... add even more safety if needed Bar and weight storage bars will hold Standard or Olympic style weight plates The IM2000 is designed to be used in conjunction with Ironmaster products and attachments but can accommodate other brands of plates cable attachments and benches Weight rating is 1000 lbs 450 KGS for the frame and lifting bar Cable System is rated for 350 lbs 159 KGS Ironmaster recommends...

Page 2: ... for correct orientation prior to assembly M12x100mm bolt Nylock Nut M12 washer BASE LEG BASE CENTER BASE LEG FOOTPLATE First install BASE CENTER over and onto the BASE LEGS Then attach the FOOTPLATE to the BASE LEGS and after making sure all botls are aligned properly tighten entire assembly 2 wrenches are needed to fully tighten the Nylock nuts NOTE Before proceeding to step two make sure that t...

Page 3: ...set to the bottom of the SLIDE RAIL fit into the BASE assembly as shown Check that the base of SLIDE RAIL is lined up Parallel to the BASE LEG before securing Repeat procedure with SLIDE RAIL BASE FRAME ASSEMBLY Installing 1 2 x25mm bolt and washer through BASE FRAME into SLIDE RAIL Prior to Standing completed assembly check that 1 Bolts attaching SLIDE RAILS to BASEFRAME assembly are properly tig...

Page 4: ...AR over top of SLIDE RAILS with CHIN UP BAR safety hooks in the correct orientation CHIN UP BAR hooks facing same direction able to lock in same positional orientation as SAFETY STOP hook NOTE When not in use safety stop should be stored all the way down to the base as shown left CAUTION 2 People are strongly recommended for ease of alignment and to avoid possible injury LIFTING BAR Completed Step...

Page 5: ...ly SPINE With two people install the SPINE onto the BASE ASSEM BLY as shown using the above mentioned bolts to secure Note insert the M12x100mm bolt M12 washer front to rear and secure from back with M12 washer and nylock nut Do not fully tighten yet Next with 2x M12x100mm bolts 4x M12 washers and 2x nylock nuts assemble CROSSMEMBER Into bottom of TOP CENTER as shown Tighten firmly M12 washer M12x...

Page 6: ...12 x 180mm bolts CAUTION 2 People are strongly recommended for ease of alignment and to avoid possible injury TIP Don t tighten until you are sure that the SLIDE RAILS have not moved and the entire assembly is square Slide the LIFTING BAR up and down the SLIDE RAILS It should not bind and the safety hooks should locate in the same position on both sides of the SLIDE RAILs prior to tightening the a...

Page 7: ...0x40mm bolts M10 washers through the bottom three holes located in the rear of the SPINE and secure the PLATE HOLD ERS into position Tighten Then slide the 8x STAND OFF plastic spacers onto the PLATE HOLDERS Next locate the J hook shown below and install through the uppermost hole in SPINE the M10x40mm bolt M10 washer and the J hook as shown STAND OFF plastic spacer J HOOK PLATE HOLDER STAND OFF p...

Page 8: ...CABLE over the PULLEY and then install front PULLEY as shown left Note only one washer is used on the bolt side Note correct ori entation of UPPER CABLE hook Next install the rear PULLEY making sure that the UPPER PULLEY CABLE is running over the top of both PULLEYS Check that both PULLEYS and cable travel smoothly before moving onto STEP 7 Tighten securely Front PULLEY UPPER PULLEY CABLE UPPER CA...

Page 9: ...LLEY BAR with M12x45mm bolt nylock nut and M12 washer Slide FOAM PAD onto LOW PULLEY BAR and secure with Plastic Cap M8 Washer and M8x25mm bolt Install LOW PULLEY BAR onto MAINFRAME on left side as shown Align BALL PIN through MAINFRAME Pin bracket and then Through LOW PULLEY BAR NOTE Make sure the LOW PULLEY BAR is mounted as shown so that LOW PULLEY BAR can pivot into the MAINFRAME or be locked ...

Page 10: ...e LAT PULL BAR to the LOW PULLEY CABLE using a Carabineer Make sure the J hook is properly seated un der the LIFT BAR and that the Safety hooks on LIFTING BAR are located in upper position with lock out bolt in place prior to use J Hook BALL PIN LOW PULLEY CABLE Carabineer When not in use the LOW PULLEY BAR swings into the frame as shown Leave the BALL PIN in the mainframe to avoid loss When not i...

Page 11: ... inward once more to re engage the Lock out Pins and if finished remove the Safety bolt and install it in the lower position thereby locking the Lock out Pin into the Slide rail During Cable use the LIFT ING BAR lock out pins will be in the upward position with the safety bolt in the storage position above lock ing the LIFTING bar into the free sliding position Once exercise is complete either low...

Page 12: ... above shall constitute complete fulfillment of all liabilities and responsibilities of Ironmaster to the purchaser with respect to the product and shall constitute full satisfaction of all claims whether based on contract negligence strict liability or otherwise In no event shall Ironmaster be liable or in any other way responsible for damages or defects in the product whichwere caused by repairs...

Page 13: ......

Page 14: ......

Reviews: