3
Step 7: Thread UPPER CABLE #26 over right top
pulley and connect the WEIGHT CARRIAGE #23 with
the SNAP HOOK #22. Set PULLEY #15a over the
cable and fit into the IDLER PULLEY HOUSING #30
with Allen Bolt #15b and Nut #15c. Leave hand tight
for now.
Step 8: Thread LOWER CABLE #27 under left bottom pul-
ley, through the tube hole and screw in the adjustment bolt
into the threaded hole in the BASE FRAME #9. Set PULLEY
#15a under the cable and fit into the IDLER PULLEY HOUS-
ING #30 with Allen Bolt #15b and Nut #15c. Leave hand tight
for now.
Lower left pulley
Upper cable
Idler Pulley
housing
Snap Hook
Install lower left
pulley only after cable
is threaded through
the tube hole, as front
of cable will not pass
with pulley in place.
Lower idle arm pulley to be
installed after cable is
threaded around pulley to
allow cable head to pass.
7
8
Weight
Carriage
Slide rail
Weight
Carriage
Pulley
Spring
Top Pulley
Bracket
#15b/15c
Front Tube
Upright
Slide Rail
Bolt #1
Washer #3
Nut #2
Bolt #1
Washer #3
Nut #2
#15b/15c