Appearance upon completion of Step 4.
4A. Attach the Front Crossbeam (D) and the two Mounting Plates (L) to the
two front Vertical Posts (B) at the location of the matching by using:
4 - (7)
Hex Head Bolt M12x1.75x80L
6 - (52)
Washer D13xD24x2.5
2 - (76)
Nylon Nut M12
Note:
The Front Crossbeam (D) can be installed at a height of 83” inches, or 86”
inches depending on which set of holes are used at the top of the Vertical Posts (B).
4B. Mount the Close Grip Bars (F) and Wide Grip Bar (E) to the Front
Crossbeam (D) by using:
4 - (17)
Hex Head Bolt M12x1.75x85L
4 - (55)
Spring Washer D20xD12x3.2
8 - (52)
Washer D13xD24x2.5
4 - (78)
Cap Nut M12
Thoroughly tighten the hardware once complete.
16
STEP
4
Summary of Contents for 6877.1-051116
Page 2: ......
Page 5: ...LABEL PLACEMENT 3 ...
Page 8: ...OVERVIEW DRAWING 6 ...
Page 9: ...OVERVIEW DRAWING 7 ...
Page 10: ...HARDWARE PACK 8 ...
Page 13: ...8 STEP 1 11 Wrench 2PCS ...
Page 15: ...STEP 2 13 Wrench 2PCS ...
Page 17: ...STEP 3 15 Wrench 2PCS ...
Page 19: ...STEP 4 17 Wrench 2PCS ...
Page 21: ...STEP 5 19 Wrench 2PCS ...
Page 23: ...ADJUSTMENT 21 ...