For Concrete Ground Installation:
If the swing set is set up on grounds with sandy soil, it must be anchored with concrete footing
(concrete not included).
Dig holes around swing leg tube as shown below in drawing. As you dig down and create a
cylindrical hole, you should use a shovel to carve out the lower part of the hole, to create a larger
diameter hole at the bottom.
Place 2 inch high brick or 2 inches of gravel bed as shown in drawing below.
Use about 45lb of concrete per leg.
Cover concrete with dirt and protective surface material.
Allow about 6-7 days for concrete to dry properly.
Note: The maximum fall height for this product is 6 feet. The minimum ground
clearance between the bottom of the suspended plays and the playing or ground
service must be 8 inches.
Must keep a minimum 8 inches of space with the soil.
Warning: Please bury the legs of the swing set as per
instruction. If the swing set is used without proper anchoring,
it may be dangerous and may tilt over.
This play ground received ASTM F2276 and CPSIA
certification.
Brick or gravel bed
1.
97
i
n
ch
e
s
12.6 inches
Concrete
Frame Leg
5 i
n
c
h
es
8”
Summary of Contents for 8103
Page 2: ...1 8103 3 060716 ...
Page 6: ...5 IMPORTANT LABELS ...