www.desatech.com www.ironhaus.com
123126-01A
18
IN
PILO
T
IN
OUT
VENT
TH
TP
TH
TP
InStaLLatIOn
Continued
Figure 25 - Connecting Incoming Gas Line to Flex Gas Line
Gas Shutoff
Valve
Flexible Gas Line
Do NOT Kink
1/2" NPT
Incoming
Gas Line
Note:
1) Wire connections not
shown for clarity
2) * 1/8" NPT Plugged
Tapping
Red Surface Indicates For
Propane/LP Use Only
Pilot
Adjustment
Inlet Pressure Tap
Outlet
Pressure Tap
3" Min.
(7.6 cm)
Side W
all
Of Applianc
e
Incoming
1/2" Gas Line
Permitted by
Local Codes
Sediment Trap
(Not Supplied)
Figure 24 - Sediment Trap
Figure 23 - Installing Gas Line
Gas Line
Opening
Equipment
Shutoff Valve
Valve on
Module
CAUTION: Compounds used
on threaded joints of gas piping
shall be resistant to the action
of Liquefied Petroleum (LP or
propane) and should be applied
lightly to ensure excess sealant
does not enter the gas line.
WARNING: All gas piping
and connections must be tested
for leaks after the installation is
completed.
After ensuring that gas valve
is on, apply a commercial leak
detection solution to all con-
nections and joints. If bubbles
appear, leaks can be detected
and corrected.
Do not use an open flame for leak
testing and do not operate any
appliance if a leak is detected.
Complete your gas installation by connect-
ing incoming gas line with flexible gas line.
Secure tightly with wrench but
DO NOT
OVERTIGHTEN
.