40
Assembly Instructions
Step 2 – Tongue to Tank Assembly
With tank assembly on base of crate, place tongue in bracket on tank
assembly and align holes, as shown below.
Insert (2) bolts and (2) locknuts.
Torque to 83 ft.-lbs.
Place jack in down position and lock into place.
Carefully roll assembly off crate base.
Tools Needed
3/4” Wrench
Torque Wrench
3/4” Socket
Ratchet
Fasteners Needed from Parts Bag:
Tongue to Tank
1/2 Nylon Lock Nut
Qty 2
Tongue to Tank
1/2 x 3-1/2 Bolt
Qty 2
*Call AAA Rent-All at 225-291-1356 for assistance ordering parts*