Installation Instructions
-
Installation Sequence:
The Habanero can be mounted either horizontally or at an incline of up to 30° as shown in the
clearance to combustibles table (previous section). A review of the job site will usually indicate a
logical installation location and order. However, time and expense can be saved if installation is
begun at the most critical dimension, watching for interference from overhead beams etc. Figure
below provides a general overview of the components utilized in the installation, as well as their
general relationship.
Caution:
In areas where seismic forces are present extra / additional bracing may be required.
Caution:
The heater must have a minimum clearance of 8 feet below, but less than 8 feet hanging
application can be considered as long as it meets local codes and minimum clearance to
combustibles.
Wall or Wood Post
Hanging Option
Ceiling Hanging
Option