![IR Energy EvenTube ETS Installation, Operation And Service Instructions Download Page 40](http://html1.mh-extra.com/html/ir-energy/eventube-ets/eventube-ets_installation-operation-and-service-instructions_2089960040.webp)
S
ERIES
E
VEN
-T
UBE
40
10-03-2017
Replacement Parts List
Item
Part No.
Description
1
UG105
UG106
Gas Train Assembly
for Natural Gas
Gas Train Assembly
for Propane
2
CE201
CE202
Ignition Module
Wire Harness w/5 pin PLUG to Ignition Module
3
CE011
Blower Motor Assembly w/ 0.26A PSC Motor
4
CE058
Transformer, 115V to 24VAC, 40VA
5
CE291
CE028
CE028
CE021
For ETS 50:
Air Switch w/
Bracket, 0.50” w.c.
For ETS 60:
Air Switch w/ Bracket, 0.78
” w.c.
For ETS 80:
Air
Switch w/ Bracket, 0.78” w.c.
For ETS 100:
Air Switch w/ B
racket, 0.55” w.c.
6
UG001
CE002
CE003
CE006
CE036
Burner Cup
Electrode for Sparking
Electrode for Flame Sense
Wire, Ignition
Wire, Flame Sense
7
CE057
Operation Light, Amber, 28VAC
8
US225
Grill
9
US215
Service Door
10
US224
Cowling
-
CE010
Power Cord
(Not Shown)
7
9
8
10
00
6
4
2
1
3
5