Product Description of BRT-606
Page 4 of 5
Shenzhen Asia Bright Industry co., Ltd., Building 10, Asia Industrial Park, Gangtou, Bantian, Shenzhen, China.
© 2015 All rights reserved. Subject to change without notices.
Step one:
Use a screwdriver to pry off the front plate in position A;
Step two:
Wiring according to the diagram and the labelled ports of the switch; and
Step three: Install screws and front plate.
Fig. 6
Installation Guide of Wall Mount Unit
BRT-606 Timer Switch Setup:
1.
Following the wiring diagram and Installation Guide to set up the wall mount unit, and power
it with 220 voltages.
2.
Flip down the front plate from the top edge.
3.
Set up Time and Date: Press the
SET
button, the displayed hours will flash, and then press
–
or
+
to adjust the hours. Press the
SET
button again, the displayed minutes will flash, and
then press
–
or
+
to adjust the minutes. Press the
SET
button again, the displayed date will
flash, and then press – or + to adjust the date. Finally, press the SET button to finish and the
settings are saved.
4.
Set up Delay off Time: The delay-off time of the two loads can be set separately.
Setting up the first load:
The longest delay off time is 30 minutes. Press the
I
button to set
the minutes, and then press button
◁
or
▷
to adjust the minutes. Press the
I
button again to
set the seconds, and then press button
◁
and
▷
to adjust the seconds. Finally, press and hold
the
I
button to save the settings or the settings will be saved automatically if there is no
keypad operation for 15 seconds.
Setting up the second load:
Use the
Ⅱ
button to set up the second load in the same way
as setting up the first load..