BASIC STEPS 

Ensure  that  all  EXTERNAL  doors  and 
windows are CLOSED.  Where no doors 
or windows are fitted, temporarily screen 
off the openings. 
 

POSITIONING 

 

For  small  areas  position  centrally  in  the 
area  to  be  dried.    For  larger  areas  such 
as  open  plan  buildings,  offices  or 
factories,  a  number  of  dryers  may  be 
required,  in  such  cases  they  should  be 
spaced evenly around the area.  Ensure 
that  no  unit  is  positioned  is  such  a  way 
that it blows directly into another. 
 
For  private  houses  or  flats,  position  the 
dryer  on  one  floor  at  a  time,  starting  at 
the lowest floor, closing all internal doors 
on  the  floor  previously  dried.    Continue 
until all floor levels have been dried. 
 
Note when a particular damp patch is to 
be dried out the air outlet grille should be 
directed  towards  that  area  but  should 
NEVER  be  closer  than  1m  to  the 
surface.    At  no  time  should  the  inlet  or 
outlet grilles be covered or obstructed. 
 

DRAINAGE 

 

Under  most  operating  conditions  water 
will  be  produced  continuously  and  it  is 
important that it is drained away correctly 
and not allowed to spill.  Any spillage will 
evaporate and will, therefore, have to be 
recycled  through  the  dryer  again,  which 
in effect, only prolongs the drying period. 

 

PORTABLE CONTAINERS 

 
Position 

closed 

top 

container 

underneath  the  water  discharge  pipe 
(approximately  8  litres  capacity).    Place 
a  short  length  of  pipe  one  end  over  the 
discharge  pipe  and  the  other  end  in  the 
container.    Use  a  transparent  container, 
this will enable  you to check the level of 
water and so prevent it from overflowing.  
As  the  unit  will  be  running  for  long 
periods  of  time,  a  regular  check  should 
be made on the container water level. 
 

PERMANENT DRAINAGE 

 

Connect  a  flexible  hose  to  the  water 
discharge pipe of sufficient length so that 
it  will  reach  a  permanent  drain.    The 
gravity  head  created  will  allow  for  a 
gradual  fall  from  the  unit  to  the  drain.  
Ensure that the hose is free of kinks and 
is not allowed to rise at any  point above 
the  level  of  the  discharge  point  from  the 
dehumidifier.    Any  air  locks  which  may 
be created, should the level be raised by 
the  hose  passing  over  obstructions, 
could  cause  the  water  to  “back  up”  the 
hose and spill from the dryer. 
 

SWITCHING ON 

 

Check the voltage selection switch is set 
to  the  correct  voltage.    (Dual  voltage 
machines  only)    Plug  the  unit  into  the 
power supply and switch on. 
 

SWITCHING OFF 

 

Turn 

off 

the 

power 

supply 

and 

disconnect. 

 

Summary of Contents for BD70

Page 1: ...avent Adremit Limited Unit 5a Commercial Yard Settle North Yorkshire BD24 9RH Get In Touch Call 0845 6880112 Email info adremit co uk BD70 INDUSTRIAL DEHUMIDIFIER USER MANUAL Drawing No TPC323 Issue 5...

Page 2: ...se the BD70 dehumidifier Please read it thoroughly before operating the dehumidifier If you have any questions about the unit please contact our Customer Service Department at the address shown at the...

Page 3: ...fier is a robust compact unit designed to control the humidity in the enclosed space in which it is placed The unit is thermally protected and will switch off for a period if the maximum operating tem...

Page 4: ...ed away correctly and not allowed to spill Any spillage will evaporate and will therefore have to be recycled through the dryer again which in effect only prolongs the drying period PORTABLE CONTAINER...

Page 5: ...he compressor is diverted into the evaporator coil where it melts the ice which has formed on the evaporator coil DUAL VOLTAGE MODELS The BD70 dehumidifier unit is fitted with a transformer which will...

Page 6: ...EFORE ATTEMPTING TO POWER THE UNNIT DUAL VOLTAGE UNNITS ONLY DO USE A RESIDUAL CURRENT DEVICE RCD WHERE POSSIBLE SERVICE The machine should be services by qualified Ebac personnel or other persons hav...

Page 7: ...4 5 Maximum Extraction 20 20 Noise Level Less than 50dba when running Finish Epoxy Coated Zintec Steel Mobility Light in construction and easily positioned Normal Rated Extraction at 15 C 65 RH Condit...

Page 8: ...involved Children shall not play with the appliance Cleaning and user maintenance shall not be made by children without supervision If the SUPPLY CORD is damaged it must be replaced by the manufacture...

Page 9: ...n circuit under no circumstances must direct heat be applied to the evaporator coil in an attempt to remove the build up of ice No attempt should be made to cut open any part of the refrigeration circ...

Page 10: ...Our Address Puravent Adremit Limited Unit 5a Commercial Yard Settle North Yorkshire BD24 9RH Get In Touch Call 0845 6880112 Email info adremit co uk...

Page 11: ...Our Address Puravent Adremit Limited Unit 5a Commercial Yard Settle North Yorkshire BD24 9RH Get In Touch Call 0845 6880112 Email info adremit co uk...

Page 12: ...4 9AD Tel 44 0 1388 664400 Fax 44 0 1388 662590 www eipl co uk sales eipl co uk American Sales Office Ebac Industrial Products Inc 700 Thimble Shoals Blvd Suite 109 Newport News Virginia 23606 2575 US...

Reviews: