background image

Page 4

Rev. 2205

912-00066-001

ILBLP CP HE SD HV WITH TBTS TEST ACCESSORY

ILBLP20-30_TBTS.EPS

AC (NORMAL) 

DRIVER

IOTA ILBLP

EMERGENCY DRIVER

LED

LOAD

WHITE

WHITE

WHT/RED

NEUTRAL

UNSWITCHED 

24/7 POWER

BLACK (120 TO 277V, 50/60HZ)

AC INPUT (120 TO 277V)

SWITCHED OR
UNSWITCHED 

HOT

RED (+)
BLUE (-)

VIOLET/WHITE (+)

 LED INPUT(-)

 LED INPUT (+)

 LED OUTPUT (+)

 LED OUTPUT (-)

YELLOW
BROWN

LEDCODE (+)
LEDCODE (-)

TBTS

TEST ACCESSORY

!

Cap unused 

LEDCODE wires

CONDITION

STATUS INDICATION

STEADY GREEN

BATTERY IS FULLY CHARGED

STEADY RED

BATTERY IS CHARGING

FLASHING GREEN

UNIT IS PERFORMING A TEST

OFF

EMERGENCY MODE

FLASHING RED/GREEN

INSUFFICIENT CHARGE

1 RED FLASH

BATTERY FAILURE

2 RED FLASHES

EMERGENCY LED LOAD FAILURE

3 RED FLASHES

ELECTRONICS FAILURE

4 RED FLASHES

TEMPERATURE OUT OF RANGE

TESTING & MAINTENANCE

Automatic Testing

 

The 

ILBLP CP HE SD HV 

is designed to automatically test 

the emergency function for 60 seconds each month, and 

90 minutes every 12 months.

 

Self-testing works in conjunction with the TBTS assembly. 

Any detected failures will be indicated by flashing of its 

 

bi-color LED. See Table A for diagnosis: 

Manual Testing

 

Manual testing of the 

ILBLP CP HE SD HV 

can be performed 

by pressing and holding the TBTS test button for two seconds. 

Only initiate a manual test when the TBTS status indicator light 

is GREEN (see 

Table A

). Manual testing lasts 60 seconds and 

may be cancelled at any time during the test duration by press-

ing and holding the TBTS for at least two seconds.

Table A: 

TBTS Diagnostic Codes

WIRING DIAGRAM

Refer to the diagram below for the appropriate wiring of the LED load and driver. Install in accordance with the National Electrical 

Code and local regulations. For additional wiring diagrams consult Customer Service.

“Written records of testing shall be kept by the owner for inspection by the authority having jurisdiction.”

SERVICING SHOULD BE PERFORMED BY QUALIFIED PERSONNEL.

 

Consult Customer Service or visit www.iotaengineering.com for current warranty information.

Load Calibration

To ensure proper operation, Load Calibration is required whenever the LED load connected to the ILBLP CP HE SD HV is 

changed. 

Note: 

Load Calibration happens automatically 48 hours after the ILBLP CP HE SD HV is first installed. 

If after instal

-

lation,

 

the connected LED load is changed

Load Calibration will need to be performed

. This will happen 

automatically 

48 hours after the ILBLP CP HE SD HV is re-initialized (see Maintenance section below). To 

manually 

initiate Load Calibration 

earlier, press and hold the TBTS button for 20 seconds. After 20 seconds, the LED load will turn off. Release the TBTS button. 

The LED load should turn back on and the TBTS will begin FLASHING GREEN to indicate that the 60-second Load Calibration is 

commencing. Any failures detected during Load Calibration will be indicated on the TBTS (see 

Table A

).

Maintenance

When performing maintenance on the 

ILBLP CP HE SD HV or the emergency luminaire

, the 

ILBLP CP HE SD HV 

battery 

circuit must be completely powered down by performing the following steps:

1) Disconnect AC power. 

The ILBLP CP HE SD HV will enter EMERGENCY MODE.

2) Disconnect the battery circuit through one of the following methods:

Method 1: 

This can only be performed within the first 30 seconds of EMERGENCY Mode -

 

Press and hold the TBTS button 

for approximately five seconds until the LED Module shuts off.

 

Method 2: 

Unplug the TBTS

Once all power sources are disconnected from the 

ILBLP CP HE SD HV 

and 

emergency luminaire

, proceed with required 

maintenance.
When 

maintenance is complete

, reconnect the TBTS (if unplugged) and restore AC power to the emergency luminaire. The AC 

Activate circuitry will detect the presence of AC power and automatically re-activate the 

ILBLP CP HE SD HV

 battery charging 

circuit.

Summary of Contents for ILBLP CP10 HE SD

Page 1: ...should be performed by qualified personnel only De energize before opening 6 The ILBLP CP HE SD HV is for use with grounded LED luminaires listed to UL standards Not for use in heated air outlets or hazardous locations 7 The ILBLP CP HE SD HV and A C driver must be on the same branch circuit 8 Do not mount near gas or electric heaters 9 The ILBLP CP HE SD HV should be mounted in locations and at h...

Page 2: ...erly seated in the TBTS Socket then mark the TBTS location on the switch box plate with the TBTS Label and apply the SD Status Indicator Sticker FLEX CEILING TILE LED DRIVER AND ARRAY COMPARTMENT TBTS Lorem ipsum TBTS ILBLP CP HE SD HV LUMINAIRE HOUSING L U M I N A I R E H O U S I N G T B T S N U T TBTS NUT Remote Mounting The TBTS may be remote mounted from the fixture up to 25 feet Before extend...

Page 3: ...d allow the unit to charge for at least 1 hour before performing a functional test B Verify that the TBTS light is on The lamp will illuminate Red while the battery is charging and Green when the battery is fully charged C Press and hold the TBTS button for two seconds The pilot light will blink Within five seconds the LED Module should be operating at a reduced light output The test mode runs for...

Page 4: ...r inspection by the authority having jurisdiction SERVICING SHOULD BE PERFORMED BY QUALIFIED PERSONNEL Consult Customer Service or visit www iotaengineering com for current warranty information Load Calibration To ensure proper operation Load Calibration is required whenever the LED load connected to the ILBLP CP HE SD HV is changed Note Load Calibration happens automatically 48 hours after the IL...

Page 5: ... CP HE SD HV est conçu pour être utilisé avec des luminaires à DEL mis à la terre homologués UL Ne pas utiliser avec des prises d air chauffées ou dans des endroits dangereux 7 Le pilote ILBLP CP HE SD HV et c a doit être sur le même circuit de dérivation 8 Ne pas installer à proximité d appareils de chauffage au gaz ou électriques 9 L ILBLP CP HE SD HV doit être installé à des endroits et à des h...

Page 6: ...rges LED haute tension non classe 2 Voir l illustration 1 pour les tensions nominales de sortie par modèle ILBLP ÉTAPE 3 INSTALLER LE COMMUTATEUR DE TEST DU CORPS FILETÉ TBTS A Trouvez un emplacement satisfaisant pour la TBTS et le câble qui est visible à l extérieur du luminaire Percez ou défoncez un trou d un diamètre de 1 2 po dans la paroi du luminaire ou dans le couvercle du chemin de câbles ...

Page 7: ... alimentation secteur fait fonctionner le module DEL comme prévu L ILBLP CP HE SD HV est en mode de chargement en veille Le TBTS est allumé et indique de manière visuelle que la batterie est en cours de chargement Mode d urgence L alimentation secteur tombe en panne L ILBLP CP HE SD HV détecte la panne de courant et bascule automatiquement en mode d urgence Le module DEL est allumé et la sortie es...

Page 8: ...inq secondes jusqu à ce que le module à DEL s éteigne Méthode 2 Débranchez le TBTS Une fois que toutes les sources d alimentation sont débranchées du luminaire ILBLP CP HE SD HV et du luminaire d urgence procéder à l entretien requis Une fois l entretien terminé rebrancher le TBTS si débranché et rétablir l alimentation c a au luminaire d urgence Le circuit AC Activate détectera la présence d une ...

Reviews: