Page 4

68018-000 

REV 2005

ILB CP CW - SINGLE LEAD ACID BATTERY CONFIGURATION

ILB CP CW 1LA.EPS

AC (NORMAL) 

DRIVER

IOTA ILB CP CW

EMERGENCY DRIVER

LED

LOAD

BATTERY

BLACK

WHITE

BLACK

BLACK/WHITE

COMMON

UNSWITCHED 

24/7 POWER

BLK/ORG (120 TO 277V, 50/60HZ)

WHITE

SWITCHED OR
UNSWITCHED 

HOT

IPS

TEST ACCESSORY

RED (+)
BLUE/WHITE (-)

RED/WHITE (+)

 LED INPUT(-)

 LED INPUT (+)

 LED OUTPUT (+)

 LED OUTPUT (-)

BR

OW

N

VIOLET

RED (+)

BLA

CK(-)

BATTERY (-)

BATTERY (+)

WHT

RED

UNIT CONNECTOR

ILB CP CW - SINGLE LEAD ACID BATTERY CONFIGURATION

ILB CP CW 1LA.EPS

AC (NORMAL) 

DRIVER

IOTA ILB CP CW

EMERGENCY DRIVER

LED

LOAD

BATTERY 1

BLACK

WHITE

BLACK

BLACK/WHITE

COMMON

UNSWITCHED 

24/7 POWER

BLK/ORG (120 TO 277V, 50/60HZ)

WHITE

SWITCHED OR
UNSWITCHED 

HOT

IPS

TEST ACCESSORY

RED (+)
BLUE/WHITE (-)

RED/WHITE (+)

 LED INPUT(-)

 LED INPUT (+)

 LED OUTPUT (+)

 LED OUTPUT (-)

BR

OW

N

VIOLET

RED (+)

BLA

CK(-)

BATTERY (-)

BATTERY (+)

RED (+)

BLA

CK(-)

BATTERY (-)

BATTERY (+)

WHT

RED

BATTERY 2

UNIT CONNECTOR

UNIT CONNECTOR

Typical Wiring Diagram - Single Battery Configuration          

Typical Wiring Diagram - Dual Battery Configuration          

TESTING & MAINTENANCE

COMPLETE WIRING DIAGRAMS

Pressing the

 IPS

 turns off the light on the 

IPS 

and forces the unit into emergency mode, interrupting power to the desig-

nated A.C. driver. The LED load is now being lit by the 

ILB CP18 HE CW

 unit. After releasing the

 IPS

, the fixture returns 

to normal operation after a momentary delay.

Initial Testing

 – Allow the unit to charge approximately 1 hour, then conduct a short discharge test. Allow a 24 hour 

charge before conducting a one hour test.
The 

ILB CP18 HE CW

 is a maintenance free unit, however, periodic inspection and testing is required. NFPA 101, Life 

Safety Code, outlines the following schedule:

Monthly 

– Insure that the 

IPS 

light

 

is illuminated. Conduct a 30 second discharge test by depressing the 

IPS

. At least 

one LED should operate at reduced output.

Annually

 – Insure that the 

IPS light 

is illuminated. Conduct a full 90 minute discharge test. The unit should operate as 

intended for the duration of the test.

“Written records of testing shall be kept by the owner for inspection by the authority having jurisdiction.”

SERVICING SHOULD BE PERFORMED BY QUALIFIED PERSONNEL. 

Consult Customer Service or visit www.iotaengineering.com for current warranty information.