![Invest MSC-24/QD FP Service Manual Download Page 19](http://html1.mh-extra.com/html/invest/msc-24-qd-fp/msc-24-qd-fp_service-manual_2085183019.webp)
17
7.8 Evacuation
Procedure:
1. Connect the vacuum pump to the charge set’s centre hose.
2. Evacuation for approximately one hour.
Confirm that the gauge needle has moved toward -0.1 Mpa (-76 cmHg) [vacuum of 4 mmHg or less].
3. Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge needle
does not move (approximately 5 minutes after turning off the vacuum pump).
4. Disconnect the charge hose from the vacuum pump.
Vacuum pump oil, if the vacuum pump oil becomes dirty or depleted, replenish as needle.
Summary of Contents for MSC-24/QD FP
Page 8: ...6 3 Dimension 3 1 Indoor Unit MSC 24 QD FP MSH 24 QD FP...
Page 9: ...7 3 2 Outdoor Unit MSC 24 QD FP...
Page 11: ...9 5 Refrigerant cycle diagram...
Page 12: ...10 6 Wiring diagram 6 1 Indoor Unit MSC 24 QD FP MSH 24 QD FP...
Page 13: ...11 6 2 Outdoor Unit MSC 24 QD FP...
Page 37: ...35...