![Invest MSC-24/QD FP Service Manual Download Page 14](http://html1.mh-extra.com/html/invest/msc-24-qd-fp/msc-24-qd-fp_service-manual_2085183014.webp)
12
7. Installation details
7.1 Wrench torque sheet for installation
Outside diameter
Torque
mm inch Kgf.m
Ф
9.52 3/8 4.2
Ф
16.0 5/8 6.6
7.2 Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit 9K 12K
18K
24K
mm
2
1.5 1.5
2.5
2.5
7.3 Pipe length and the elevation
Pipe size
Additional
Max.
Max.
Capacity
Btu/h
Gas Liquid
Standard
length
refrigerant
Length
Elevation
(g/m)
A (m)
B (m)
(m)
24K 5/8’’
(
Ф
16.0) 3/8’’
(
Ф
9.52)
5 10 25 40
Caution:
Capacity is based on standard length and maximum allowance length is base of reliability.
Oil trap should be installed per 5-7 meters.
7.4 Air purging of the piping and indoor unit
Required tools:
Hexagonal wrench; adjustable wrench; torque wrenches, wrench to hold the joints and gas leak detector.
Note:
The air in the indoor unit and in the piping must be purged. If air remains in the refrigeration piping, it will affect
the compressor, reduce the cooling capacity, and could lead to a malfunction of unit.
Be sure, using a torque wrench to tighten the service port cap (after using the service port), so that it prevents
Summary of Contents for MSC-24/QD FP
Page 8: ...6 3 Dimension 3 1 Indoor Unit MSC 24 QD FP MSH 24 QD FP...
Page 9: ...7 3 2 Outdoor Unit MSC 24 QD FP...
Page 11: ...9 5 Refrigerant cycle diagram...
Page 12: ...10 6 Wiring diagram 6 1 Indoor Unit MSC 24 QD FP MSH 24 QD FP...
Page 13: ...11 6 2 Outdoor Unit MSC 24 QD FP...
Page 37: ...35...