![Invest MSC-24/QD FP Service Manual Download Page 18](http://html1.mh-extra.com/html/invest/msc-24-qd-fp/msc-24-qd-fp_service-manual_2085183018.webp)
16
7.7 Balance refrigerant of the 2-way, 3-way valves
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the open position.
2. Connect the charge set to the 3-way valve’s service port.
Leave the valve on the charge set closed.
Connect the charge hose with the push pin to the service port.
3. Open the valves (Low side) on the charge set and discharge the refrigerant until the gauge indicates 0.05 to 0.1Mpa.
If there is no air in the refrigeration cycle [the pressure when the air conditioner is not running is higher than
0.1Mpa, discharge the refrigerant until the gauge indicates 0.05 to 0.1 Mpa. If this is the case, it will not be necessary
to apply a evacuation.
Discharge the refrigeration gradually; if it is discharged too suddenly, the refrigeration oil sill be discharged.
Summary of Contents for MSC-24/QD FP
Page 8: ...6 3 Dimension 3 1 Indoor Unit MSC 24 QD FP MSH 24 QD FP...
Page 9: ...7 3 2 Outdoor Unit MSC 24 QD FP...
Page 11: ...9 5 Refrigerant cycle diagram...
Page 12: ...10 6 Wiring diagram 6 1 Indoor Unit MSC 24 QD FP MSH 24 QD FP...
Page 13: ...11 6 2 Outdoor Unit MSC 24 QD FP...
Page 37: ...35...