HEAT PUMP WATER HEATER MAINTENANCE
40
4. Connet the pipe of 4-way
valve with system pipeline.
Weld them.
Wrap the valve with wet cloth in
case of burnt gliding block and
entering of water.
Weld the pipeline.
During welding, charge nitrogen
of 0.5±0.1kgf/cm
2
(relative
pressure).
Do not burn the other parts during
soldering.
5. Install electric magnetic coil
of 4-way valve.
Perform leak test for the welding
spot.
Tighten the fixing screw.
Disassembly and Assembly of Heat Exchanger
Remark: Make sure that there isn’t any refrigerant in pipe system and the power supply is cut off before removal
of the heat exchanger.
Step Illustration
Handling
Instruction
1. Solder off the heat exchnager
Wrap the inflow pipe and
outflow pipe with wet cloth.
During welding, charge
nitrogen of 0.5±0.1kgf/cm
2
(relative pressure).
2. Remove the heat exchanger
Remove the heat exchanger
carefully. Avoid hiting other pipe
or parts.
Summary of Contents for DHW-C3.5/A1-K
Page 1: ......
Page 3: ...1 PRODUCT...
Page 4: ......
Page 12: ...10 CONTROL...
Page 13: ...HEAT PUMP WATER HEATER CONTROL 11 UNITS CONTROL 1 OPERATION FLOWCHART...
Page 21: ...19 INSTALLATION...
Page 23: ......
Page 30: ...28 MAINTENANCE...
Page 34: ...HEAT PUMP WATER HEATER MAINTENANCE 32 Discharge protection flow chart of trouble shooting E4...
Page 37: ...HEAT PUMP WATER HEATER MAINTENANCE 35 2 Model DHW C7 2 A1 K 3 Model DHW C3 8 NbA K...
Page 52: ......