4x
4x
4x
4x
18
INSTALLATION AND ASSEMBLY
iV-Office ventilation device
•
Installation and operating instructions
4
Installation and assembly
Read the section carefully before installation to avoid installation errors. The installation
and connection of the ventilation device must be carried out by qualified personnel.
4.1
Check the scope of supply
Check the delivery for completeness and transport damage upon receipt using the delivery
note. Report missing items immediately.
Figure 6:
iV-Office ventilation device standard components
1 Exterior closure
1 a: Flex Office weather protection
hood cover
1 b: Flex Office weather protection
hood base plate
1 c: Exterior wall fixing elements
1 d: Sealing tape
2 R-D250 wall sleeve
2 a: Protective discs
2 b: Mounting wedge set
3
iV-Office thermal accumulator insert
3 a: Insulated thermal accumulator
3 b: R-D200 guiding vane
3 c: Xenion EFP reversible fan
3 d: Slim guiding vane (16 mm)
3 e: BUS plug connection
3 f: Sound insulation lining
4 Flair XL inner cover
4 a: Interior wall installation material
4 b: G4 dust filter
4 c: IB Flair XL adapter (pre-assembled)
2
4b
4c
4
3c
3
3e
3d
3f
3a
2a
2b
1a
1c
1b
1d
3b
4a